Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Afful, A E, Ayarkwa, J, Acquah, G K K, Osei-Asibey, D and Osei Assibey, A A D (2023) Barriers to incorporation of indoor environmental quality (IEQ) principles into building designs. Engineering, Construction and Architectural Management, 30(06), 2400-19.

Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(06), 441-54.

Bröchner, J, Josephson, P-E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(06), 392–400.

Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(06), 2463-80.

Durdyev, S, Koc, K, Karaca, F and Gurgun, A P (2023) Strategies for implementation of green roofs in developing countries. Engineering, Construction and Architectural Management, 30(06), 2481-502.

Erman, E (2002) Timber joint design: the geometric breakdown method. Building Research & Information, 30(06), 446–69.

Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(06), 2602-20.

Gao, Q, Liu, B, Sun, J, Liu, C and Xu, Y (2023) Border-crossing frequencies of CO2 embodied in international trade of construction products for final demand. Engineering, Construction and Architectural Management, 30(06), 2360-80.

Jennings, W (2012) Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(06), 455-62.

Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; A case of construction industry. Engineering, Construction and Architectural Management, 30(06), 2564-81.

Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(06), 2231-54.

Lehtiranta, L, Kärnä, S, Junnonen, J-M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(06), 463-75.

Mohandes, S R, Durdyev, S, Sadeghi, H, Mahdiyar, A, Hosseini, M R, Banihashemi, S and Martek, I (2023) Towards enhancement in reliability and safety of construction projects: developing a hybrid multi-dimensional fuzzy-based approach. Engineering, Construction and Architectural Management, 30(06), 2255-79.

  • Type: Journal Article
  • Keywords: construction safety; construction workers; fuzzy ahp; fuzzy topsis; safety risk assessment
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-09-2021-0817
  • Abstract:

    Purpose: In the study, a five-dimensional-safety risk assessment model (5D-SRAM) is developed to improve the construction safety risk assessment approaches available in the literature. To that purpose, a hybrid multi-dimensional fuzzy-based model is proposed, which provides a comprehensive ranking system for the safety risks existing in a project by considering the contextualization of the construction-related activities resulting in an accident. Design/methodology/approach: The developed 5D-SRAM is based on an amalgamation of different fuzzy-based techniques. Through the proposed fuzzy analytic hierarchy process (AHP) method, the importance weights of essential risk dimensions playing role in defining the magnitude of the construction-related risks are obtained, while a precise prioritized ranking system for the identified safety risks is acquired using the proposed fuzzy technique of order preference similarity to the ideal solution (FTOPSIS). Findings: Through the application of the proposed 5D-SRAM to a real-life case study – which is the case of green building construction projects located in Hong Kong – contributions are realized as follows: (1) determination of a more complete range of risk dimensions, (2) calculation of importance weightings for each risk dimension and (3) obtainment of a precise and inclusive ranking system for safety risks. Additionally, the supremacy of the developed 5D-SRAM against the other safety assessment approaches that are commonly adopted in the construction industry is proved. Research limitations/implications: The developed 5D-SRAM provides the concerned safety decision-makers with not only all the crucial dimensions that play roles toward the magnitude of safety risks posing threats to the workers involved in construction activities, but also they are given hindsight regarding the importance weights of these dimensions. Additionally, the concerned parties are embellished with the final ranking of safety risks in a more comprehensive way than those of existing assessment methods, leading to sagacious adoption of future prudent strategies for dealing with such risks occurring on construction sites. Originality/value: Numerous studies have documented the safety risks faced by construction workers including proposals for risk assessment models. However, the dimensions considered by such models are limited, generally constrained to risk event probability combined with risk impact severity. Overlooking other dimensions that are essential towards the calculation of safety risks’ magnitude culminates in overshadowing the further adoption of fruitful mitigative actions. To overcome this shortcoming, this study proposes a novel 5D-SRAM.

Ofori, G (2002) Singapore's construction: moving toward a knowledge-based industry. Building Research & Information, 30(06), 401–12.

Olatunji, O A, Ramanayaka, C D E, Rotimi, F E and Rotimi, J O B (2023) Analysis of contractors' administrative characteristics in bid decision factors. Engineering, Construction and Architectural Management, 30(06), 2420-35.

Omar, H and Mahdjoubi, L (2023) Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example. Engineering, Construction and Architectural Management, 30(06), 2185-205.

Onubi, H O, Hassan, A S, Yusof, N and Bahdad, A A S (2023) Moderating effect of project size on the relationship between COVID-19 safety protocols and economic performance of construction projects. Engineering, Construction and Architectural Management, 30(06), 2206-30.

Pietroforte, R and Miller, J B (2002) Procurement methods for US infrastructure: historical perspectives and recent trends. Building Research & Information, 30(06), 425–35.

Qiu, Y and Chen, H (2023) A systematic review of the knowledge domain of institutional theory in construction project management. Engineering, Construction and Architectural Management, 30(06), 2523-44.

Reeves, K (2002) Construction business systems in Japan: general contractors and subcontractors. Building Research & Information, 30(06), 413–24.

Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(06), 435–45.

Shahid, M U, Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost – a case of Pakistan. Engineering, Construction and Architectural Management, 30(06), 2304-33.

Shi, C, Chen, Y, Hua, Y and Tang, Y (2023) Understanding subcontracting organizational arrangements for construction projects in China: integrating capabilities and uncertainty. Engineering, Construction and Architectural Management, 30(06), 2381-99.

Shi, Q, Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: a Chinese case study. Construction Management and Economics, 30(06), 425-40.

Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: the case of Saudi Arabia. Engineering, Construction and Architectural Management, 30(06), 2545-63.

Tetteh, M O, Chan, A P C, Nani, G, Darko, A and Oppong, G D (2023) Impacts of management control mechanisms on the performance of international construction joint ventures: an empirical study. Engineering, Construction and Architectural Management, 30(06), 2280-303.

Xie, L L, Luo, Z and Zhao, X (2023) Critical factors of construction workers' career promotion: evidence from Guangzhou city. Engineering, Construction and Architectural Management, 30(06), 2334-59.

Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(06), 477-91.

Zaman, U, Florez-Perez, L, Anjam, M, Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(06), 2436-62.

Zhang, H M, Chong, H Y, Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(06), 2503-22.