Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 30 results ...
Afful, A E, Ayarkwa, J, Acquah, G K K, Osei-Asibey, D and Osei Assibey, A A D (2023) Barriers to incorporation of indoor environmental quality (IEQ) principles into building designs. Engineering, Construction and Architectural Management, 30(06), 2400-19.
Boyd, D and Bentley, D (2012) A critique of conceptions of design and management in construction projects. Construction Management and Economics, 30(06), 441-54.
Bröchner, J, Josephson, P-E and Kadefors, A (2002) Swedish construction culture, quality management and collaborative practice. Building Research & Information, 30(06), 392–400.
Cevikbas, M and Işık, Z (2023) Detecting the most appropriate delay analysis methods for mega airport projects. Engineering, Construction and Architectural Management, 30(06), 2463-80.
Durdyev, S, Koc, K, Karaca, F and Gurgun, A P (2023) Strategies for implementation of green roofs in developing countries. Engineering, Construction and Architectural Management, 30(06), 2481-502.
Erman, E (2002) Timber joint design: the geometric breakdown method. Building Research & Information, 30(06), 446–69.
Fitriani, H and Ajayi, S (2023) Investigation of requisite measures for enhancing sustainable construction practices in Indonesia. Engineering, Construction and Architectural Management, 30(06), 2602-20.
Gao, Q, Liu, B, Sun, J, Liu, C and Xu, Y (2023) Border-crossing frequencies of CO2 embodied in international trade of construction products for final demand. Engineering, Construction and Architectural Management, 30(06), 2360-80.
Jennings, W (2012) Why costs overrun: risk, optimism and uncertainty in budgeting for the London 2012 Olympic Games. Construction Management and Economics, 30(06), 455-62.
Khatatbeh, A A (2023) Quantifying the impact of ISO 9001 standard on the project and engineering management and success factors; A case of construction industry. Engineering, Construction and Architectural Management, 30(06), 2564-81.
Langston, C (2023) The empirical relationship between contractor success and project innovation. Engineering, Construction and Architectural Management, 30(06), 2231-54.
- Type: Journal Article
- Keywords: head contractor success; project delivery success; project innovation; value for money
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-05-2021-0460
- Abstract:
Purpose: Innovation during project delivery is contested space. The aim in this research is to empirically explore the theory of this contested space and how project implementation can be optimized by the contractor to deliver better outcomes. It is hypothesized that project innovation has a proportional and measurable relationship to contractor success. Design/methodology/approach: Based on a novel conceptual framework, this research applies a case study methodology to analyse 31 construction projects undertaken by a single Australian middle-tier contractor. Benefits from innovation are not often equitably shared. There are risks and rewards. The project innovation zone is defined as a combination of three key performance indicators – efficacy, efficiency and margin – merged into a single index that most likely shows evidence of “working smarter”. Findings: Client–contractor project innovation (c2pi) is demonstrated to be strongly correlated with head contractor success (HCS), yielding an r2 value of 71%. Innovative projects mostly show positive change in efficacy, efficiency and margin when comparing “planned” and “actual” outcomes. Across the cases studied, 35% demonstrated likely evidence of innovative delivery and 52% demonstrated evidence of success from the construction contractor’s perspective. Originality/value: These findings verify that, within the studied sample, the pursuit of innovation leads to projects that are likely to also have greater success for the head contractor, evidenced by the mix of five critical success factors: finishing on schedule, making profit, and having less defects, less accidents and higher quality workmanship. These outcomes arguably also apply to sub-contractors, where the head contractor assumes the role of “client”.
Lehtiranta, L, Kärnä, S, Junnonen, J-M and Julin, P (2012) The role of multi-firm satisfaction in construction project success. Construction Management and Economics, 30(06), 463-75.
Mohandes, S R, Durdyev, S, Sadeghi, H, Mahdiyar, A, Hosseini, M R, Banihashemi, S and Martek, I (2023) Towards enhancement in reliability and safety of construction projects: developing a hybrid multi-dimensional fuzzy-based approach. Engineering, Construction and Architectural Management, 30(06), 2255-79.
Ofori, G (2002) Singapore's construction: moving toward a knowledge-based industry. Building Research & Information, 30(06), 401–12.
Olatunji, O A, Ramanayaka, C D E, Rotimi, F E and Rotimi, J O B (2023) Analysis of contractors' administrative characteristics in bid decision factors. Engineering, Construction and Architectural Management, 30(06), 2420-35.
Omar, H and Mahdjoubi, L (2023) Practical solutions for improving the suboptimal performance of construction projects using Dubai construction projects as an example. Engineering, Construction and Architectural Management, 30(06), 2185-205.
Onubi, H O, Hassan, A S, Yusof, N and Bahdad, A A S (2023) Moderating effect of project size on the relationship between COVID-19 safety protocols and economic performance of construction projects. Engineering, Construction and Architectural Management, 30(06), 2206-30.
Pietroforte, R and Miller, J B (2002) Procurement methods for US infrastructure: historical perspectives and recent trends. Building Research & Information, 30(06), 425–35.
Qiu, Y and Chen, H (2023) A systematic review of the knowledge domain of institutional theory in construction project management. Engineering, Construction and Architectural Management, 30(06), 2523-44.
Reeves, K (2002) Construction business systems in Japan: general contractors and subcontractors. Building Research & Information, 30(06), 413–24.
Rwelamila, P D (2002) Creating an effective construction industry strategy in South Africa. Building Research & Information, 30(06), 435–45.
Shahid, M U, Thaheem, M J and Arshad, H (2023) Quantification and benchmarking of construction waste and its impact on cost – a case of Pakistan. Engineering, Construction and Architectural Management, 30(06), 2304-33.
Shi, C, Chen, Y, Hua, Y and Tang, Y (2023) Understanding subcontracting organizational arrangements for construction projects in China: integrating capabilities and uncertainty. Engineering, Construction and Architectural Management, 30(06), 2381-99.
Shi, Q, Zuo, J and Zillante, G (2012) Exploring the management of sustainable construction at the programme level: a Chinese case study. Construction Management and Economics, 30(06), 425-40.
Sodangi, M (2023) Towards attaining efficient joint ventures in international construction: the case of Saudi Arabia. Engineering, Construction and Architectural Management, 30(06), 2545-63.
Tetteh, M O, Chan, A P C, Nani, G, Darko, A and Oppong, G D (2023) Impacts of management control mechanisms on the performance of international construction joint ventures: an empirical study. Engineering, Construction and Architectural Management, 30(06), 2280-303.
Xie, L L, Luo, Z and Zhao, X (2023) Critical factors of construction workers' career promotion: evidence from Guangzhou city. Engineering, Construction and Architectural Management, 30(06), 2334-59.
Yuan, X X (2012) Bayesian method for the correlated competitive bidding model. Construction Management and Economics, 30(06), 477-91.
Zaman, U, Florez-Perez, L, Anjam, M, Ghani Khwaja, M and Ul-Huda, N (2023) At the end of the world, turn left: examining toxic leadership, team silence and success in mega construction projects. Engineering, Construction and Architectural Management, 30(06), 2436-62.
Zhang, H M, Chong, H Y, Zeng, Y and Zhang, W (2023) The effective mediating role of stakeholder management in the relationship between BIM implementation and project performance. Engineering, Construction and Architectural Management, 30(06), 2503-22.