Charkhakan, M H and Heravi, G (2023) Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(05), 1932-50.

  • Type: Journal Article
  • Keywords: change management; change occurrence; conflict management; construction projects
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-11-2019-0651
  • Abstract:

    Purpose: Although several studies have aimed to present models to predict conflict outcomes, fewer methods have been developed to analyze conflict manageability and provide management strategies based on prediction models. This research pitches into the manageability analysis of conflicts occur during the implementation of a proposed change in construction projects. In this way, a framework has been developed by defining two parameters: the predictability index and the preventability index. Design/methodology/approach: Within this framework, the predictability index determines how many outcomes of the prediction model can be used for conflict management based on the degree of clarity. The preventability index demonstrates how preventive measures for conflict management can be identified. Eventually, three preventive measures can be determined: (1) identifying weaknesses of decision-making patterns and organizational culture, (2) identifying events that may be prevented using soft skills and (3) identifying differences among similar change-implementation scenarios and evaluating causes of the differences. To demonstrate the capabilities of proposed framework, a practical example has been analyzed. Findings: The results show that the behavior of the project parties can be psychologically analyzed, and psychological conflicts can be distinguished from technical conflicts. Moreover, identifying the weaknesses of parties’ decision-making patterns and their organizational culture is the most effective measure to prevent the conflicts. Originality/value: This research contributes to the construction body of knowledge by quantifying the predictability and preventability of conflicts between the project parties in a construction project based on: (1) the certainty level of the conflict occurrence and (2) the level of alignment between predicted outcomes of the conflict occurrence and the issued change request and/or change order.

Chew, M Y L (2002) Resistance of polyurethane sealants to hot water. Building Research & Information, 30(05), 367–71.

Choy, L H T, Ho, W K O and Mak, S W K (2012) Housing attributes and Hong Kong real estate prices: a quantile regression analysis. Construction Management and Economics, 30(05), 359-66.

Jacobsson, M and Linderoth, H C J (2012) User perceptions of ICT impacts in Swedish construction companies: 'it's fine, just as it is'. Construction Management and Economics, 30(05), 339-57.

Kerali, A G and Thomas, T H (2002) Effect of mix retention and curing on low-cement walling blocks. Building Research & Information, 30(05), 362–6.

Khanh, H D, Kim, S Y and Linh, L Q (2023) Construction productivity prediction through Bayesian networks for building projects: case from Vietnam. Engineering, Construction and Architectural Management, 30(05), 2075-100.

Kohler, N and Lutzkendorf, T (2002) Integrated life-cycle analysis. Building Research & Information, 30(05), 338–48.

Liang, R, Li, R, Yan, X, Xue, Z and Wei, X (2023) Evaluating and selecting the supplier in prefabricated megaprojects using extended fuzzy TOPSIS under hesitant environment: a case study from China. Engineering, Construction and Architectural Management, 30(05), 1902-31.

Lingard, H C, Cooke, T and Blismas, N (2012) Designing for construction workers' occupational health and safety: a case study of socio-material complexity. Construction Management and Economics, 30(05), 367-82.

Liu, L, Wang, X and Sheng, Z (2012) Achieving ambidexterity in large, complex engineering projects: a case study of the Sutong Bridge project. Construction Management and Economics, 30(05), 399-409.

Maharjan, S, Shrestha, P P and Srirangam, D (2023) Impact of mobilization costs on schedule performance of highway projects. Engineering, Construction and Architectural Management, 30(05), 2008-25.

Mansoori, S, Harkonen, J and Haapasalo, H (2023) Productization and product structure enabling BIM implementation in construction. Engineering, Construction and Architectural Management, 30(05), 2155-84.

Moshtaghian, F and Noorzai, E (2023) Integration of risk management within the building information modeling (BIM) framework. Engineering, Construction and Architectural Management, 30(05), 1951-77.

Osuizugbo, I C, Kukoyi, P O, Abisuga, A O and Ibrahim, K (2023) Choosing to be a craftsperson: factors influencing career decision-making among apprentices. Engineering, Construction and Architectural Management, 30(05), 2026-47.

Pham, H T, Pham, T, Truong Quang, H and Dang, C N (2023) Impact of transformational leadership on green learning and green innovation in construction supply chains. Engineering, Construction and Architectural Management, 30(05), 1883-901.

Qabaja, M and Tenekeci, G (2023) Nexus between construction sector and economic indicators for Turkey and European Union evidenced by panel data analysis. Engineering, Construction and Architectural Management, 30(05), 1978-2007.

Sena, T C and Fabricio, M M (2023) Framework proposal for BIM implementation in Brazilian construction and development companies. Engineering, Construction and Architectural Management, 30(05), 2101-23.

Sompolgrunk, A, Banihashemi, S, Hosseini, M R, Golzad, H and Hajirasouli, A (2023) An integrated model of BIM return on investment for Australian small- and medium-sized enterprises (SMEs). Engineering, Construction and Architectural Management, 30(05), 2048-74.

Stasinopoulos, T N (2023) Comparing insolation on building façades in five different climates. Engineering, Construction and Architectural Management, 30(05), 1835-63.

Straub, A (2002) Strategic technical management of housing stock: lessons from Dutch housing associations. Building Research & Information, 30(05), 372–81.

Tam, C M, Tam, V W Y and Zeng, S X (2002) Environmental Performance Evaluation (EPE) for construction. Building Research & Information, 30(05), 349–61.

Wuni, I Y, Shen, G Q and Saka, A B (2023) Computing the severities of critical onsite assembly risk factors for modular integrated construction projects. Engineering, Construction and Architectural Management, 30(05), 1864-82.

Zhang, Q, Oo, B L and Lim, B T H (2023) Key practices and impact factors of corporate social responsibility implementation: Evidence from construction firms. Engineering, Construction and Architectural Management, 30(05), 2124-54.

Zimina, D, Ballard, G and Pasquire, C (2012) Target value design: using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(05), 383-98.