Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 25 results ...
Abbasianjahromi, H and Aghakarimi, M (2023) Safety performance prediction and modification strategies for construction projects via machine learning techniques. Engineering, Construction and Architectural Management, 30(03), 1146-64.
Ashkanani, S and Franzoi, R (2023) Gaps in megaproject management system literature: a systematic overview. Engineering, Construction and Architectural Management, 30(03), 1300-18.
Chotibhongs, R and Arditi, D (2012) Analysis of collusive bidding behaviour. Construction Management and Economics, 30(03), 221-31.
Dabirian, S, Ahmadi, M and Abbaspour, S (2023) Analyzing the impact of financial policies on construction projects performance using system dynamics. Engineering, Construction and Architectural Management, 30(03), 1201-21.
- Type: Journal Article
- Keywords: cash flow management; construction project; cost; financial policies; system dynamics
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-05-2021-0431
- Abstract:
Purpose: The research aims to analyze the effects of financial policies on a cash flow system to meet project performance goals and improve profitability. The policies are divided into four groups; owner related, bank-related, labor-related and supplier-related policies. This research presents a developed model for planning, forecasting and managing the cash flow in construction projects using system dynamics (SD). Design/methodology/approach: A System Dynamics (SD model is developed to evaluate the effect of different financial policies on construction project performance. By identifying the feedback loops in the cash flow system, a dynamic model is developed to forecast, plan and manage different policies, including prepayment, overbilling, loans, incentive payment, delay in payment and equipment lease. Findings: A case study (a construction activity as part of a pharmaceutical factory development project) is used to analyze the cash flow and financing policies. The findings demonstrate the effects of different policies such as incentive payments on project cash flow estimation, which proved to reduce the project duration, improve the profit and increase the financing during the project execution. Originality/value: The presented model would be a major attempt to estimate precisely the cash flow and the effect of employing different financial policies on project performance. Applying this model, project managers and decision-makers have the opportunity to model different financial policies concerning a variety of limiting variables applicable to each situation. Ultimately, with this, one can make more reasoned decisions and, in effect, optimize the utility of the project.
Devaney, S and Roberts, D (2012) Who gets the jobs? Factors influencing the employability of property and construction graduates in the UK. Construction Management and Economics, 30(03), 233-46.
Devapriya, K A K and Ganesan, S (2002) Technology transfer subcontracting in developing countries through. Building Research & Information, 30(03), 171–82.
Duan, P and Zhou, J (2023) Cascading vulnerability analysis of unsafe behaviors of construction workers from the perspective of network modeling. Engineering, Construction and Architectural Management, 30(03), 1037-60.
English, J (2002) Managing cultural differences to improve industrial efficiency. Building Research & Information, 30(03), 196–204.
Franz, B, Wang, T and Issa, R R (2023) Exploration of burnout in early-career construction management professionals in the USA. Engineering, Construction and Architectural Management, 30(03), 1061-79.
Jaradat, S and Beunders, N (2023) Participatory design in refugee camps: Ethnographic case studies from Greece. Engineering, Construction and Architectural Management, 30(03), 1080-97.
Jiang, L, Zhao, T, Feng, C and Zhang, W (2023) Improvement of random forest by multiple imputation applied to tower crane accident prediction with missing data. Engineering, Construction and Architectural Management, 30(03), 1222-42.
Joseph, V R and Mustaffa, N K (2023) Carbon emissions management in construction operations: a systematic review. Engineering, Construction and Architectural Management, 30(03), 1271-99.
Kumaraswamy, M M and Shrestha, G B (2002) Targeting 'technology exchange' for faster organizational and industry development. Building Research & Information, 30(03), 183–95.
Liu, X X, Liu, H H, Yang, G L and Pan, J F (2023) Productivity assessment of the real estate industry in China: a DEA-Malmquist index. Engineering, Construction and Architectural Management, 30(03), 1243-70.
Lopes, J, Ruddock, L and Ribeiro, F L (2002) Investment in construction and economic growth in developing countries. Building Research & Information, 30(03), 152–9.
Murguia, D, Demian, P and Soetanto, R (2023) The role of the industry's cultural-cognitive elements on actors' intention to adopt BIM: an empirical study in Peru. Engineering, Construction and Architectural Management, 30(03), 1183-200.
Ngowi, A B, Iwisi, D S and Mushi, R J (2002) Competitive strategy of low financial in a context resources. Building Research & Information, 30(03), 205–11.
Polesie, P M A (2012) Reducing the use of resources in medium-sized Swedish construction enterprises: production managers' views. Construction Management and Economics, 30(03), 193-202.
Rashed, A and Mutis, I (2023) Trends of integrated project delivery implementations viewed from an emerging innovation framework. Engineering, Construction and Architectural Management, 30(03), 989-1014.
Rotimi, J O B, Ramanayaka, C D E, Olatunji, O A and Rotimi, F E (2023) Migrant construction workers' demography and job satisfaction: a New Zealand study. Engineering, Construction and Architectural Management, 30(03), 1122-45.
Schoenwitz, M, Naim, M and Potter, A (2012) The nature of choice in mass customized house building. Construction Management and Economics, 30(03), 203-19.
Shahi, S, Beesley, P and Haas, C T (2023) Creating space and time for innovation - a methodology for building adaptation design appraisal using physics-based simulation tools and interactive multi-objective optimization. Engineering, Construction and Architectural Management, 30(03), 1098-121.
Shang, T, Hu, X, Ye, K and Tam, V W Y (2023) Will contractors pursue unsustainable practices following environmental recovery? A highway case in China. Engineering, Construction and Architectural Management, 30(03), 1165-82.
Zawdie, G and Langford, D A (2002) Influence of construction-based infrastructure on the development process in Sub-Saharan Africa. Building Research & Information, 30(03), 160–70.
Zhao, G, Yu, X, Zhang, J, Li, W and Wu, P (2023) Neighborhood micro-renewal: a perspective of gene in China. Engineering, Construction and Architectural Management, 30(03), 1015-36.