Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 24 results ...
Abdul-Aziz, A-R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(01), 37–55.
Almufarrej, A M and Erfani, T (2023) Climate, buildings’ envelope design and energy patterns: improving energy performance of new buildings in Kuwait. Engineering, Construction and Architectural Management, 30(01), 172-88.
Amadi, A (2023) Integration in a mixed-method case study of construction phenomena: from data to theory. Engineering, Construction and Architectural Management, 30(01), 210-37.
Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(01), 81–92.
Davey, C L, Powell, J A, Powell, J E and Cooper, I (2002) Action learning in a medium-sized construction company. Building Research & Information, 30(01), 5–15.
Dou, Y, Sun, X, Ji, A, Wang, Y and Xue, X (2023) Development strategy for prefabricated construction projects: a tripartite evolutionary game based on prospect theory. Engineering, Construction and Architectural Management, 30(01), 105-24.
Feng, K, Chen, S, Lu, W, Wang, S, Yang, B, Sun, C and Wang, Y (2023) Embedding ensemble learning into simulation-based optimisation: a learning-based optimisation approach for construction planning. Engineering, Construction and Architectural Management, 30(01), 259-95.
Gounder, S, Hasan, A, Shrestha, A and Elmualim, A (2023) Barriers to the use of sustainable materials in Australian building projects. Engineering, Construction and Architectural Management, 30(01), 189-209.
Gurung, N and Mahendran, M (2002) Comparative life cycle costs for new steel portal frame building systems. Building Research & Information, 30(01), 35–46.
Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry. Engineering, Construction and Architectural Management, 30(01), 321-63.
Irfan, M, Khalid, R A, Kaka Khel, S S U H, Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(01), 154-71.
Kus, H and Nygren, K (2002) Microenvironmental characterization of rendered autoclaved aerated concrete. Building Research & Information, 30(01), 25–34.
Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(01), 57–79.
Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(01), 56-73.
Parchamijalal, M, Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (CMOMM) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(01), 74-104.
Ruan, X, Ochieng, E G, Price, A D F and Egbu, C O (2012) Knowledge integration process in construction projects: a social network analysis approach to compare competitive and collaborative working. Construction Management and Economics, 30(01).
Salmaninezhad, M and Jazayeri Moghaddas, S M (2023) A multi-attribute approach to select the best method for repairing river bridge columns. Engineering, Construction and Architectural Management, 30(01), 1-18.
Sharifi, A A and Farahinia, A H (2023) A theoretical framework for developing the MAU model to determine the most appropriate use for historic buildings. Engineering, Construction and Architectural Management, 30(01), 238-58.
Shipworth, D T (2002) A stochastic framework for embodies greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(01), 16–24.
Sorooshnia, E, Rashidi, M, Rahnamayiezekavat, P, Rezaei, F and Samali, B (2023) Optimum external shading system for counterbalancing glare probability and daylight illuminance in Sydney's residential buildings. Engineering, Construction and Architectural Management, 30(01), 296-320.
Tabish, S Z S and Jha, K N (2012) The impact of anti-corruption strategies on corruption free performance in public construction projects. Construction Management and Economics, 30(01), 21–35.
Tian, B, Wang, Z, Li, C and Fu, J (2023) Can relational governance improve sustainability in public-private partnership infrastructure projects? An empirical study based on structural equation modeling. Engineering, Construction and Architectural Management, 30(01), 19-40.
Xu, Y, Chong, H Y and Chi, M (2023) Modelling the blockchain adoption barriers in the AEC industry. Engineering, Construction and Architectural Management, 30(01), 125-53.
Yılmaz, F (2023) Analysis of the interaction between safety measures and workers' safety awareness from the construction workers' perspective. Engineering, Construction and Architectural Management, 30(01), 41-55.
- Type: Journal Article
- Keywords: construction safety; management; organization; questionnaire survey; risk management
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-07-2021-0564
- Abstract:
Purpose: The research was carried out to statistically evaluate the relationship between the safety measures at the construction sites and the actual and perceived knowledge levels of the employees about these measures. Design/methodology/approach: Face-to-face surveys were conducted with the workers. The survey included some perception-based questions about preventive measures at the construction site, as well as determining the level of awareness of employees on occupational health and safety (OHS) practices. The data were analyzed with descriptive statistical methods and bivariate correlation analysis. Findings: The actual knowledge levels of workers on OHS measures in the workplace is significantly lower than their perceived knowledge levels. However, there is a positive, linear and strong relationship between the actual knowledge levels of the employees about some OHS rules applied in the workplace and the general level of knowledge they perceive about themselves. Some protective measures such as occupational safety expert, OHS board, employee representatives, training and information activities at construction sites positively affect the safety awareness of employees. However, low-frequency and documentation-intensive activities such as risk assessment, emergency activities and periodic controls have no or weak correlations. Originality/value: Perception-based opinions of construction site workers on occupational safety issues are transformed into numerical data and analyzed with a quantitative method.