Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 24 results ...

Abdul-Aziz, A-R (2012) Control mechanisms exercised in Malaysian housing public-private partnerships. Construction Management and Economics, 30(01), 37–55.

Almufarrej, A M and Erfani, T (2023) Climate, buildings’ envelope design and energy patterns: improving energy performance of new buildings in Kuwait. Engineering, Construction and Architectural Management, 30(01), 172-88.

Amadi, A (2023) Integration in a mixed-method case study of construction phenomena: from data to theory. Engineering, Construction and Architectural Management, 30(01), 210-37.

Cattell, D W (2012) An overview of component unit pricing theory. Construction Management and Economics, 30(01), 81–92.

Davey, C L, Powell, J A, Powell, J E and Cooper, I (2002) Action learning in a medium-sized construction company. Building Research & Information, 30(01), 5–15.

Dou, Y, Sun, X, Ji, A, Wang, Y and Xue, X (2023) Development strategy for prefabricated construction projects: a tripartite evolutionary game based on prospect theory. Engineering, Construction and Architectural Management, 30(01), 105-24.

Feng, K, Chen, S, Lu, W, Wang, S, Yang, B, Sun, C and Wang, Y (2023) Embedding ensemble learning into simulation-based optimisation: a learning-based optimisation approach for construction planning. Engineering, Construction and Architectural Management, 30(01), 259-95.

Gounder, S, Hasan, A, Shrestha, A and Elmualim, A (2023) Barriers to the use of sustainable materials in Australian building projects. Engineering, Construction and Architectural Management, 30(01), 189-209.

Gurung, N and Mahendran, M (2002) Comparative life cycle costs for new steel portal frame building systems. Building Research & Information, 30(01), 35–46.

Hosseinian, A H and Baradaran, V (2023) A two-phase approach for solving the multi-skill resource-constrained multi-project scheduling problem: a case study in construction industry. Engineering, Construction and Architectural Management, 30(01), 321-63.

Irfan, M, Khalid, R A, Kaka Khel, S S U H, Maqsoom, A and Sherani, I K (2023) Impact of work–life balance with the role of organizational support and job burnout on project performance. Engineering, Construction and Architectural Management, 30(01), 154-71.

Kus, H and Nygren, K (2002) Microenvironmental characterization of rendered autoclaved aerated concrete. Building Research & Information, 30(01), 25–34.

  • Type: Journal Article
  • Keywords: autoclaved aerated concrete; materials; microenvironment; moisture; performance; rendering; walls; Sweden
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=3ymxg8f0f1yy81ch
  • Abstract:
    The long-term behaviour and physical and mechanical properties of external walls made of rendered autoclaved aerated concrete (AAC) show a great variety under different exposure conditions related to climate and geography. The performance of the porous system depends greatly on its moisture characteristics and the severity of the agents acting within its microenvironment. In order to gather systematic data on the actual in-service performance of rendered AAC walls, an international research programme was initiated to provide continuous microenvironment monitoring of rendered AAC blocks naturally exposed on a test rack and rendered AAC test panels mounted at the . eld exposure station. In the experimental study, a comparison is made between the environmental exposure data at local and micro levels, and the performance assessment of different rendering systems based on the data and results of continuous moisture measurements at micro scale is presented.

Lahdenperä, P (2012) Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery. Construction Management and Economics, 30(01), 57–79.

Lee, J S (2023) Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(01), 56-73.

Parchamijalal, M, Moradi, S and Zabihi Shirazi, M (2023) Claim management office maturity model (CMOMM) in project-oriented organizations in the construction industry. Engineering, Construction and Architectural Management, 30(01), 74-104.

Ruan, X, Ochieng, E G, Price, A D F and Egbu, C O (2012) Knowledge integration process in construction projects: a social network analysis approach to compare competitive and collaborative working. Construction Management and Economics, 30(01).

Salmaninezhad, M and Jazayeri Moghaddas, S M (2023) A multi-attribute approach to select the best method for repairing river bridge columns. Engineering, Construction and Architectural Management, 30(01), 1-18.

Sharifi, A A and Farahinia, A H (2023) A theoretical framework for developing the MAU model to determine the most appropriate use for historic buildings. Engineering, Construction and Architectural Management, 30(01), 238-58.

Shipworth, D T (2002) A stochastic framework for embodies greenhouse gas emissions modelling of construction materials. Building Research & Information, 30(01), 16–24.

Sorooshnia, E, Rashidi, M, Rahnamayiezekavat, P, Rezaei, F and Samali, B (2023) Optimum external shading system for counterbalancing glare probability and daylight illuminance in Sydney's residential buildings. Engineering, Construction and Architectural Management, 30(01), 296-320.

Tabish, S Z S and Jha, K N (2012) The impact of anti-corruption strategies on corruption free performance in public construction projects. Construction Management and Economics, 30(01), 21–35.

Tian, B, Wang, Z, Li, C and Fu, J (2023) Can relational governance improve sustainability in public-private partnership infrastructure projects? An empirical study based on structural equation modeling. Engineering, Construction and Architectural Management, 30(01), 19-40.

Xu, Y, Chong, H Y and Chi, M (2023) Modelling the blockchain adoption barriers in the AEC industry. Engineering, Construction and Architectural Management, 30(01), 125-53.

Yılmaz, F (2023) Analysis of the interaction between safety measures and workers' safety awareness from the construction workers' perspective. Engineering, Construction and Architectural Management, 30(01), 41-55.