Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 28 results ...
Aibinu, A A, Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives. Construction Management and Economics, 29(05), 463–81.
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(05), 2183-206.
Cole, R J (2001) Lessons learned, future directions and issues for GBC. Building Research & Information, 29(05), 355–73.
Deal, B (2001) Ecological urban dynamics: the convergence of spatial modelling and sustainability. Building Research & Information, 29(05), 381–93.
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(05), 2106-29.
Gambatese, J A and Hallowell, M (2011) Factors that influence the development and diffusion of technical innovations in the construction industry. Construction Management and Economics, 29(05), 507–17.
Garay, A, Ruiz, A and Guevara, J (2022) Dynamic evaluation of thermal comfort scenarios in a Colombian large-scale social housing project. Engineering, Construction and Architectural Management, 29(05), 1909-30.
- Type: Journal Article
- Keywords: CO2 emissions; social housing; sustainability; system dynamics; thermal comfort
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-09-2020-0684
- Abstract:
Purpose: This study aims to analyze the technical, environmental, economic and thermal comfort impacts of implementing passive measures and heating systems in Ciudad Verde, a large-scale social housing project located at the periphery of Bogota, Colombia. Design/methodology/approach: A system dynamics (SD) model is proposed to evaluate scenarios through counterfactual experiments, including technical, environmental and economic components. Model inputs are obtained from building energy simulation models and data collected from official reports, public policy documents and construction records. Findings: Results suggest that the use of heating systems is the best choice to achieve thermal comfort conditions throughout the day. However, both the capital expenditures and CO2 emissions associated with such system make their adoption very difficult. In line with that, the use of heating systems in combination with passive measures stands out as a viable solution since their costs are affordable and their use contributes to reducing CO2 emissions. Originality/value: The proposed model recreates the dynamics underlying social housing construction processes, the adoption of heating systems and passive measures in low-income dwellings and their corresponding impact on CO2 emissions and indoor thermal comfort conditions. The model can be employed as a support tool in the formulation of social housing policies associated with thermal comfort specifications. In this way, the model represents a first step toward incorporating thermal-related variables into the decision-making processes related to social housing planning and development.
Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(05), 2073-105.
Hon, C K H, Sun, C, Xia, B, Jimmieson, N L, Way, K A and Wu, P P Y (2022) Applications of Bayesian approaches in construction management research: a systematic review. Engineering, Construction and Architectural Management, 29(05), 2153-82.
Hou, W and Wang, L (2022) Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand. Engineering, Construction and Architectural Management, 29(05), 2047-72.
Jarkas, A and Horner, M (2011) Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management and Economics, 29(05), 483–93.
John, S T, Mohan, A, Philip, M S, Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(05), 1991-2010.
Kim, Y W, Han, S, Shin, S and Choi, K (2011) A case study of activity‐based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(05), 449–61.
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(05), 1946-64.
Larsson, N K and Cole, R J (2001) Green building challenge: the development of an idea. Building Research & Information, 29(05), 45.
Liou, F m, Yang, C h, Chen, B and Chen, W (2011) Identifying the Pareto‐front approximation for negotiations of BOT contracts with a multi‐objective genetic algorithm. Construction Management and Economics, 29(05), 535–48.
Luo, L, Zhang, L, Zheng, X and Wu, G (2022) A hybrid approach for investigating impacts of leadership dynamics on project performance. Engineering, Construction and Architectural Management, 29(05), 1965-90.
Mackley, C J and Milonas, S (2001) Knowledge transfer and Green Building Challenge. Building Research & Information, 29(05), 54.
Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(05), 495–506.
Plessis, C d (2001) Sustainability and sustainable construction: the African context. Building Research & Information, 29(05), 374–80.
Rahmani, F, Scott-Young, C, Tadayon, A and van der Walt, J D (2022) Team composition in relational contracting (RC) in large infrastructure projects: a Belbin’s team roles model approach. Engineering, Construction and Architectural Management, 29(05), 2027-46.
Said, H, Mali, A and Deshmukh, A (2022) Identification and assessment of the unionization factors of the US electrical construction trade. Engineering, Construction and Architectural Management, 29(05), 2207-31.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(05), 435–48.
Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: a case study. Building Research & Information, 29(05), 394–408.
Thomas Ng, S, Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(05), 519–34.
Todd, J A, Crawley, D, Geissler, S and Lindsey, G (2001) Comparative assessment of environmental performance tools and the role of the Green Building Challenge. Building Research & Information, 29(05), 324–35.
Wang, P, Fenn, P, Wang, K and Huang, Y (2022) A Bayesian belief network predictive model for construction delay avoidance in the UK. Engineering, Construction and Architectural Management, 29(05), 2011-26.
Zhang, N, Deng, X, Hwang, B G, Bi, M and Mahmoudi, A (2022) A novel approach to selecting the best partner for high-speed rail firms. Engineering, Construction and Architectural Management, 29(05), 2130-52.