Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 28 results ...
Aibinu, A A, Ling, F Y Y and Ofori, G (2011) Structural equation modelling of organizational justice and cooperative behaviour in the construction project claims process: contractors' perspectives. Construction Management and Economics, 29(05), 463–81.
Alemu, S K (2022) Construction time prediction model for public building projects. Engineering, Construction and Architectural Management, 29(05), 2183-206.
- Type: Journal Article
- Keywords: bromilow time-cost principle; regression analysis; time prediction model
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-11-2020-0975
- Abstract:
Purpose: The aim of the study was to develop a practical construction time model for public building projects in Addis Ababa, Ethiopia. Design/methodology/approach: This research work used regression analysis and also exploratory scatter and residual plot techniques. Simple and multiple regressions were used for the investigation of the best fit time model. The analyses were carried out using IBM SPSS statistical software, version 20. Findings: The result revealed that the Bromilow time-cost principle was moderately applicable. However, the cubic regression model (CUB) was found a better time-cost relationship. On the contrary, the study has shown a poor relationship between actual time and gross floor area. Furthermore, multiple linear regression analysis (MLR) consists of three statistically significant variables were found a better fit time model. Research limitations/implications: The study is limited to only six project scope factors. Further research is recommended to include more building projects of similar type and implications of other factors to improve the reliability of the models. Practical implications: The developed model was not intended as a replacement for detailed construction scheduling techniques. The resulting model is applicable for front-end predictions of construction duration. Originality/value: The main parties involved in the building projects should apply the model for benchmarking a precise construction time during the early planning phase.
Cole, R J (2001) Lessons learned, future directions and issues for GBC. Building Research & Information, 29(05), 355–73.
Deal, B (2001) Ecological urban dynamics: the convergence of spatial modelling and sustainability. Building Research & Information, 29(05), 381–93.
Elkabalawy, M and Moselhi, O (2022) Optimized resource-constrained method for project schedule compression. Engineering, Construction and Architectural Management, 29(05), 2106-29.
Gambatese, J A and Hallowell, M (2011) Factors that influence the development and diffusion of technical innovations in the construction industry. Construction Management and Economics, 29(05), 507–17.
Garay, A, Ruiz, A and Guevara, J (2022) Dynamic evaluation of thermal comfort scenarios in a Colombian large-scale social housing project. Engineering, Construction and Architectural Management, 29(05), 1909-30.
Gunduz, M and Al-Naimi, N H (2022) Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. Engineering, Construction and Architectural Management, 29(05), 2073-105.
Hon, C K H, Sun, C, Xia, B, Jimmieson, N L, Way, K A and Wu, P P Y (2022) Applications of Bayesian approaches in construction management research: a systematic review. Engineering, Construction and Architectural Management, 29(05), 2153-82.
Hou, W and Wang, L (2022) Research on the refinancing capital structure of highway PPP projects based on dynamic capital demand. Engineering, Construction and Architectural Management, 29(05), 2047-72.
Jarkas, A and Horner, M (2011) Revisiting the applicability of learning curve theory to formwork labour productivity. Construction Management and Economics, 29(05), 483–93.
John, S T, Mohan, A, Philip, M S, Sarkar, P and Davis, R (2022) An IoT device for striking of vertical concrete formwork. Engineering, Construction and Architectural Management, 29(05), 1991-2010.
Kim, Y W, Han, S, Shin, S and Choi, K (2011) A case study of activity‐based costing in allocating rebar fabrication costs to projects. Construction Management and Economics, 29(05), 449–61.
Koc, K and Gurgun, A P (2022) Ambiguity factors in construction contracts entailing conflicts. Engineering, Construction and Architectural Management, 29(05), 1946-64.
Larsson, N K and Cole, R J (2001) Green building challenge: the development of an idea. Building Research & Information, 29(05), 45.
Liou, F m, Yang, C h, Chen, B and Chen, W (2011) Identifying the Pareto‐front approximation for negotiations of BOT contracts with a multi‐objective genetic algorithm. Construction Management and Economics, 29(05), 535–48.
Luo, L, Zhang, L, Zheng, X and Wu, G (2022) A hybrid approach for investigating impacts of leadership dynamics on project performance. Engineering, Construction and Architectural Management, 29(05), 1965-90.
Mackley, C J and Milonas, S (2001) Knowledge transfer and Green Building Challenge. Building Research & Information, 29(05), 54.
Pemsel, S and Widén, K (2011) Bridging boundaries between organizations in construction. Construction Management and Economics, 29(05), 495–506.
Plessis, C d (2001) Sustainability and sustainable construction: the African context. Building Research & Information, 29(05), 374–80.
Rahmani, F, Scott-Young, C, Tadayon, A and van der Walt, J D (2022) Team composition in relational contracting (RC) in large infrastructure projects: a Belbin’s team roles model approach. Engineering, Construction and Architectural Management, 29(05), 2027-46.
Said, H, Mali, A and Deshmukh, A (2022) Identification and assessment of the unionization factors of the US electrical construction trade. Engineering, Construction and Architectural Management, 29(05), 2207-31.
Shah, R K and Dawood, N (2011) An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, 29(05), 435–48.
Theaker, I G and Cole, R J (2001) The role of local governments in fostering 'green' buildings: a case study. Building Research & Information, 29(05), 394–408.
Thomas Ng, S, Fan, R Y C and Wong, J M W (2011) An econometric model for forecasting private construction investment in Hong Kong. Construction Management and Economics, 29(05), 519–34.
Todd, J A, Crawley, D, Geissler, S and Lindsey, G (2001) Comparative assessment of environmental performance tools and the role of the Green Building Challenge. Building Research & Information, 29(05), 324–35.
Wang, P, Fenn, P, Wang, K and Huang, Y (2022) A Bayesian belief network predictive model for construction delay avoidance in the UK. Engineering, Construction and Architectural Management, 29(05), 2011-26.
Zhang, N, Deng, X, Hwang, B G, Bi, M and Mahmoudi, A (2022) A novel approach to selecting the best partner for high-speed rail firms. Engineering, Construction and Architectural Management, 29(05), 2130-52.