Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 41 results ...

Alshibani, A, El Ghazzawi, Y A, Mohammed, A, Ghaithan, A M and Hassanain, M A (2024) A multi-criteria decision-making model for heavy construction equipment replacement in Saudi Arabia. Journal of Financial Management of Property and Construction, 29(03), 485–511.

Amadi, A I (2024) Investigating ground-related design deficiencies as potential triggers to cost overruns in highway projects. Journal of Financial Management of Property and Construction, 29(03), 349–71.

Atapattu, C N, Domingo, N and Sutrisna, M (2024) A conceptual cost estimation model for the pre-design stage of road projects using multiple regression analysis. Journal of Financial Management of Property and Construction, 29(03), 388–404.

Badamasi, A A, Aryal, K R, Makarfi, U U and Dodo, M (2022) Drivers and barriers of virtual reality adoption in UK AEC industry. Engineering, Construction and Architectural Management, 29(03), 1307-18.

Barrientos-Orellana, A, Ballesteros-Pérez, P, Mora-Melia, D, González-Cruz, M C and Vanhoucke, M (2022) Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management, 29(03), 1449-69.

Bon, R and Crosthwaite, D (2001) The future of international construction: some results of 1992-1999 surveys. Building Research & Information, 29(03), 242–7.

Chandra, V and Loosemore, M (2011) Communicating about organizational culture in the briefing process: case study of a hospital project. Construction Management and Economics, 29(03), 223–31.

Choi, J O, Shrestha, B K, Kwak, Y H and Shane, J (2022) Exploring the benefits and trade-offs of design standardization in capital projects. Engineering, Construction and Architectural Management, 29(03), 1169-93.

Chowdhury, A N, Chen, P-H and Tiong, R L K (2011) Analysing the structure of public-private partnership projects using network theory. Construction Management and Economics, 29(03), 247–60.

Davidson, C H (2001) Technology watch in the construction sector: why and how?. Building Research & Information, 29(03), 233–41.

Demirkesen, S and Tezel, A (2022) Investigating major challenges for industry 4.0 adoption among construction companies. Engineering, Construction and Architectural Management, 29(03), 1470-503.

Eghbali-Zarch, M, Tavakkoli-Moghaddam, R, Dehghan-Sanej, K and Kaboli, A (2022) Prioritizing the effective strategies for construction and demolition waste management using fuzzy IDOCRIW and WASPAS methods. Engineering, Construction and Architectural Management, 29(03), 1109-38.

Guo, J, Chen, J and Xie, Y (2022) Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory. Engineering, Construction and Architectural Management, 29(03), 1396-426.

Hernández-Nicolás, C M, Martín-Ugedo, J F and Minguez-Vera, A (2022) Women CEOs and firm performance in the construction industry: evidence from Spain. Engineering, Construction and Architectural Management, 29(03), 1343-57.

Jawad, S and Ledwith, A (2022) A measurement model of project control systems success for engineering and construction projects case study: contractor companies in Saudi's petroleum and chemical industry. Engineering, Construction and Architectural Management, 29(03), 1218-40.

Kadan, R, Omotayo, T S, Boateng, P, Nani, G and Wilson, M (2024) The application of Bayesian network analysis in demystifying construction project subcontracting complexities for developing countries. Journal of Financial Management of Property and Construction, 29(03), 444–69.

Koolwijk, J, van Oel, C and Bel, M (2022) The interplay between financial rules, trust and power in strategic partnerships in the construction industry. Engineering, Construction and Architectural Management, 29(03), 1089-108.

  • Type: Journal Article
  • Keywords: construction industry; power relations; strategic partnering; structuration theory; trust
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-09-2020-0713
  • Abstract:

    Purpose: To explore how and why the social structures of strategic partnerships are shaped by actors and how these interrelate with a team’s interpersonal relationships over time. Grasping the complexity of this interplay is essential if we want to comprehend what actually goes on in these partnerships and understand why actors often disengage from them. Design/methodology/approach: In three cases, 14 in-depth interviews were held with knowledgeable actors about important events and activities that influenced the relationships between partners. Interview data were triangulated with journals kept by the lead author, who participated as an engaged scholar in the three cases. Because this study took an interdisciplinary approach, new insights could evolve from the multi-level analysis. Findings: Trust has a moderating effect on the relation between open-book accounting and the degree of control a dominant party wants to exercise. When the level of control is raised, this can signal distrust to the other partners, which can harm the relationship. When partners feel more dependent on each other’s capabilities to reach their long-term goals, the parties seem to be less likely to put the blame on one of the partners in the case of undesirable events. Practical implications: Managers should be aware of their power position and acknowledge the effects of power on their relationships. If long-term and close collaboration does not emerge in their partnership, it may be due to how they use their power position. Originality/value: Thanks to the interdisciplinary approach, this is the first study that shows the significance of trust and power in maintaining strategic partnerships in the construction industry, and how trust can affect the financial rules of actors. © 2021, Jelle Koolwijk, Clarine van Oel and Mirjam Bel.

Koskela, L and Vrijhoef, R (2001) Is the current theory of construciton a hindrance to innovation?. Building Research & Information, 29(03), 197–207.

Laryea, S (2011) Quality of tender documents: case studies from the UK. Construction Management and Economics, 29(03), 275–86.

Li, H, Guo, H L, Skitmore, M, Huang, T, Chan, K Y N and Chan, G (2011) Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong. Construction Management and Economics, 29(03), 233–45.

Lin, Y and Yang, W (2022) Tri-optimization of building shape and envelope properties using Taguchi and constraint limit method. Engineering, Construction and Architectural Management, 29(03), 1284-306.

Maina, J J (2024) Modelling business performance from marketing practices of architecture firms in Nigeria. Journal of Financial Management of Property and Construction, 29(03), 425–43.

Mbachu, J and Frei, M (2011) Diagnosing the strategic health of an organization from SWOT analysis results: case study of the Australasian cost management profession. Construction Management and Economics, 29(03), 287–303.

Naveed, F and Khan, K I A (2022) Investigating the influence of information complexity on construction quality: a systems thinking approach. Engineering, Construction and Architectural Management, 29(03), 1427-48.

Ndekugri, I, Silverio, A K and Mason, J (2024) Enforcing payment obligations under construction contracts by insolvency proceedings. Journal of Financial Management of Property and Construction, 29(03), 372–87.

Ni, G, Zhang, Z, Yuan, Z, Huang, H, Xu, N and Deng, Y (2022) Transformation paths and influencing factors of tacit knowledge into explicit knowledge in real estate companies: a qualitative study. Engineering, Construction and Architectural Management, 29(03), 1319-42.

Ogunseiju, O, Olayiwola, J, Akanmu, A and Olatunji, O A (2022) Evaluation of postural-assist exoskeleton for manual material handling. Engineering, Construction and Architectural Management, 29(03), 1358-75.

Oke, A E, Aliu, J, Ehiosun, L U, Ebekozien, A and Rotimi, A A (2024) From hurdles to heights: Blueprint for tackling distributed ledger technology challenges in the construction sector of a developing economy. Journal of Financial Management of Property and Construction, 29(03), 405–24.

Olawumi, T O and Chan, D W M (2022) Developing project evaluation models for smart sustainable practices implementation in construction projects: a comparative study between Nigeria and Hong Kong. Engineering, Construction and Architectural Management, 29(03), 1522-52.

Oraee, M, Hosseini, M R, Edwards, D and Papadonikolaki, E (2022) Collaboration in BIM-based construction networks: a qualitative model of influential factors. Engineering, Construction and Architectural Management, 29(03), 1194-217.

Rajhans, R K (2024) Promoters’ equity pledging, policy uncertainty and firm-level cash holding: Evidence from an emerging market. Journal of Financial Management of Property and Construction, 29(03), 470–84.

Seaden, G and Manseau, A (2001) Public policy and construction innovation. Building Research & Information, 29(03), 182–96.

Shan, Y, Goodrum, P M, Zhai, D, Haas, C and Caldas, C H (2011) The impact of management practices on mechanical construction productivity. Construction Management and Economics, 29(03), 305–16.

Sharma, V, Zaki, M, Jha, K N and Krishnan, N M A (2022) Machine learning-aided cost prediction and optimization in construction operations. Engineering, Construction and Architectural Management, 29(03), 1241-57.

Slaughter, E S (2001) Design strategies to increase building flexibility. Building Research & Information, 29(03), 208–17.

Stouffs, R (2001) Visualizing information structures and its impact on project teams: an information architecture for the virtual AEC company. Building Research & Information, 29(03), 218–32.

Tabish, S Z S and Jha, K N (2011) Analyses and evaluation of irregularities in public procurement in India. Construction Management and Economics, 29(03), 261–74.

Toosi, H, Ghaaderi, M A and Shokrani, Z (2022) Comparative study of academic research on project management in Iran and the World with text mining approach and TF–IDF method. Engineering, Construction and Architectural Management, 29(03), 1553-83.

Umar, T (2022) Challenges of BIM implementation in GCC construction industry. Engineering, Construction and Architectural Management, 29(03), 1139-68.

Wang, Y, Ye, G, Zheng, C and Zhang, S (2022) Total factor productivity growth and its decomposition in the Chinese construction industry since China's accession to the World Trade Organization. Engineering, Construction and Architectural Management, 29(03), 1258-83.

Yu, J, Ma, G, Ding, W, Mao, J and Wang, J (2022) Structural model for the relationships between age-friendly communities and quality of life of older adults in Hefei, China. Engineering, Construction and Architectural Management, 29(03), 1376-95.