Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 43 results ...

Ahmadian Fard Fini, A, Maghrebi, M, Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(02), 573-600.

Ayodele, O A, Chang-Richards, Y and González, V A (2022) A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(02), 601-18.

Bordass, B, Cohen, R, Standeven, M and Leaman, A (2001) Assessing building performance in use 2: technical performance of the Probe buildings. Building Research & Information, 29(02), 103–13.

Bordass, B, Cohen, R, Standeven, M and Leaman, A (2001) Assessing building performance in use 3: technical performance of the Probe buildings. Building Research & Information, 29(02), 114–28.

Bordass, B, Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: technical performance of the Probe buildings. Building Research & Information, 29(02), 144–57.

Cao, D, Shao, S, Huang, B and Wang, G (2022) Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China. Engineering, Construction and Architectural Management, 29(02), 819-41.

Cohen, R, Standeven, M, Bordass, B and Leaman, A (2001) Assessing building performance in use 1: the Probe process. Building Research & Information, 29(02), 85–102.

Cooper, I (2001) Post-occupancy evaluation - where are you?. Building Research & Information, 29(02), 158–63.

Do, S T, Nguyen, V T and Dang, C N (2022) Exploring the relationship between failure factors and stakeholder coordination performance in high-rise building projects: empirical study in the finishing phase. Engineering, Construction and Architectural Management, 29(02), 870-95.

Eley, J (2001) How do post-occupancy evaluation and the facilities manager meet?. Building Research & Information, 29(02), 164–7.

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(02), 185–97.

Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(02), 989-1015.

Hung, Y-H, Smith-Jackson, T and Winchester, W (2011) Use of attitude congruence to identify safety interventions for small residential builders. Construction Management and Economics, 29(02), 113–30.

Katebi, A, Mohammadhosseini, A, Najmeddin, M and Homami, P (2024) The moderating impact of organizational readiness, competitive pressure and compatibility on the cost of using precast concrete components. Journal of Financial Management of Property and Construction, 29(02), 274-94.

Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(02), 643-68.

Kim, Y-W and Kim, S-C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(02), 163–72.

Larsson, N K (2001) iiSBE: the international initiative for sustainable built environment. Building Research & Information, 29(02), 175–7.

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: technical performance of the Probe buildings. Building Research & Information, 29(02), 129–43.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Loosemore, M and McCallum, A (2022) The situational and individual determinants of entrepreneurship in the construction industry. Engineering, Construction and Architectural Management, 29(02), 1038-60.

Loosemore, M, Alkilani, S Z and Hammad, A W A (2022) Barriers to employment for refugees seeking work in the Australian construction industry: an exploratory study. Engineering, Construction and Architectural Management, 29(02), 619-42.

Maheswari, J U, Mujumdar, P, Padala, S P S and Gwaskoti, A (2022) BDM–MDM integrated solution concept for scheduling information-driven projects. Engineering, Construction and Architectural Management, 29(02), 1016-37.

Mohammadi, S, Tavakolan, M and Zahraie, B (2022) An intelligent simulation-based framework for automated planning of concrete construction works. Engineering, Construction and Architectural Management, 29(02), 916-39.

Osei-Appiah, V K, Kissi, E, Karikari, V A, Ayeng, P, Danquah-Smith, E and Adesi, M (2024) Assessing the impact of early supplier involvement on public works procurement. Journal of Financial Management of Property and Construction, 29(02), 229-49.

  • Type: Journal Article
  • Keywords: early supplier involvement (esi); PLS-SEM; procurement performance
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/JFMPC-09-2022-0047
  • Abstract:
    Purpose: Works procurement performance is critical to successful project delivery. However, early supplier involvement (ESI) has been touted in other industries to impact procurement performance positively. Works procurement has been attracting significant attention from major players due to poor performance characterized by poor performance, budget overruns and incompetence. Hence, the purpose of this study was to assess the impact of ESI on public works procurement performance. Design/methodology/approach: Based on a thorough review of the literature for a pilot survey, the main questionnaires were administered to 103 public procurement officers. To assess the impact of ESI on public works procurement performance, three constructs that served as factors for implementing ESI and five that measure works procurement performance were validated using partial least square structural equation modelling (PLS-SEM). Findings: The outcome of this study shows a significant positive impact of ESI on works procurement performance. This included communication, trust and supplier capabilities. The study further showed that even though cost, schedule, quality, health and safety are essential, sustainability measures are also crucial for work procurement. Research limitations/implications: The results of this study could help firms make better decisions regarding public works procurement by encouraging ESI. This will likely significantly impact the successful project delivery and preservation of sustainability and efficiency objectives. Originality/value: The application of PLS-SEM analysis in this study provides insights into how ESI can impact the procurement of public works in Ghana. © 2023, Emerald Publishing Limited.

Ríos-Fernández, J C (2022) Thermal performance assessment of cool roofs on supermarkets through case analysis in 13 cities. Engineering, Construction and Architectural Management, 29(02), 739-54.

Rajhans, R K (2024) How do economic policy uncertainty and leverage impact firm-level cash holding distribution of housing companies in an emerging economy? A quantile regression approach. Journal of Financial Management of Property and Construction, 29(02), 331-48.

Rathnayaka, L S D, Malsha Nadeetharu, B K and Kulatunga, U (2024) Applicability of electronic document management system (EDMS) for the cost management of mega construction projects in Sri Lanka. Journal of Financial Management of Property and Construction, 29(02), 314-30.

Scrase, J I (2001) Curbing the growth in UK commercial energy consumption. Building Research & Information, 29(02), 51–61.

Shah, M A, Kumar, S, Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(02), 250-73.

Shalwani, A and Lines, B (2022) Using issue logs to improve construction project performance. Engineering, Construction and Architectural Management, 29(02), 896-915.

Sheamar, S, Wedawatta, G, Tennakoon, M, Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: an exploratory study from a contractors’ perspective. Journal of Financial Management of Property and Construction, 29(02), 211-28.

Silva, P M, Domingo, N and Ameer Ali, N A N (2024) Causes of disputes in the construction industry – a systematic literature review. Journal of Financial Management of Property and Construction, 29(02), 193-210.

Singla, H K and Chammanam, S S (2024) Development of a financial performance measurement model for real estate business: an exploratory study in India. Journal of Financial Management of Property and Construction, 29(02), 295-313.

Styhre, A (2011) In the circuit of credibility: construction workers and the norms of "a good job". Construction Management and Economics, 29(02), 199–209.

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: a case study of movement continuity. Construction Management and Economics, 29(02), 131–44.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(02), 702-15.

Wang, G, Liu, M, Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: an empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(02), 940-60.

Yang, J, Shen, P Q, Bourne, L, Ho, C M-F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(02), 145–62.

Zahoor, H, Khan, R M, Nawaz, A, Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(02), 842-69.

Zaryoun, M, Hosseini, M and Soleymani, K (2022) Sustainable architecture and earthquake resilience of vernacular Zegalli houses in northern Iran. Engineering, Construction and Architectural Management, 29(02), 1061-85.

Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: benefits and barriers. Building Research & Information, 29(02), 168–74.

Zohrehvandi, S, Khalilzadeh, M, Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(02), 716-38.

Zou, X, Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(02), 669-701.