Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 43 results ...

Ahmadian Fard Fini, A, Maghrebi, M, Forsythe, P J and Waller, T S (2022) Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction. Engineering, Construction and Architectural Management, 29(02), 573-600.

  • Type: Journal Article
  • Keywords: auto-measurement; image processing; prefabrication speed
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-04-2020-0281
  • Abstract:

    Purpose: Measuring onsite productivity has been a substance of debate in the construction industry, mainly due to concerns about accuracy, repeatability and unbiasedness. Such characteristics are central to demonstrate construction speed that can be achieved through adopting new prefabricated systems. Existing productivity measurement methods, however, cannot cost-effectively provide solid and replicable evidence of prefabrication benefits. This research proposes a low-cost automated method for measuring onsite installation productivity of prefabricated systems. Design/methodology/approach: Firstly, the captured ultra-wide footages are undistorted by extracting the curvature contours and performing a developed meta-heuristic algorithm to straighten these contours. Then a preprocessing algorithm is developed that could automatically detect and remove the noises caused by vibrations and movements. Because this study aims to accurately measure the productivity the noise free images are double checked in a specific time window to make sure that even a tiny error, which have not been detected in the previous steps, will not been amplified through the process. In the next step, the existing side view provided by the camera is converted to a top view by using a spatial transformation method. Finally, the processed images are compared with the site drawings in order to detect the construction process over time and report the measured productivity. Findings: The developed algorithms perform nearly real-time productivity computations through exact matching of actual installation process and digital design layout. The accuracy and noninterpretive use of the proposed method is demonstrated in construction of a multistorey cross-laminated timber building. Originality/value: This study uses footages of an already installed surveillance camera where the camera’s features are unknown and then image processing algorithms are deployed to retrieve accurate installation quantities and cycle times. The algorithms are almost generalized and versatile to be adjusted to measure installation productivity of other prefabricated building systems.

Ayodele, O A, Chang-Richards, Y and González, V A (2022) A framework for addressing construction labour turnover in New Zealand. Engineering, Construction and Architectural Management, 29(02), 601-18.

Bordass, B, Cohen, R, Standeven, M and Leaman, A (2001) Assessing building performance in use 2: technical performance of the Probe buildings. Building Research & Information, 29(02), 103–13.

Bordass, B, Cohen, R, Standeven, M and Leaman, A (2001) Assessing building performance in use 3: technical performance of the Probe buildings. Building Research & Information, 29(02), 114–28.

Bordass, B, Leaman, A and Ruyssevelt, P (2001) Assessing building performance in use 5: technical performance of the Probe buildings. Building Research & Information, 29(02), 144–57.

Cao, D, Shao, S, Huang, B and Wang, G (2022) Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China. Engineering, Construction and Architectural Management, 29(02), 819-41.

Cohen, R, Standeven, M, Bordass, B and Leaman, A (2001) Assessing building performance in use 1: the Probe process. Building Research & Information, 29(02), 85–102.

Cooper, I (2001) Post-occupancy evaluation - where are you?. Building Research & Information, 29(02), 158–63.

Do, S T, Nguyen, V T and Dang, C N (2022) Exploring the relationship between failure factors and stakeholder coordination performance in high-rise building projects: empirical study in the finishing phase. Engineering, Construction and Architectural Management, 29(02), 870-95.

Eley, J (2001) How do post-occupancy evaluation and the facilities manager meet?. Building Research & Information, 29(02), 164–7.

Gannon, M J and Smith, N J (2011) An effective outline business case to facilitate successful decision-making. Construction Management and Economics, 29(02), 185–97.

Gurgun, A P and Koc, K (2022) Administrative risks challenging the adoption of smart contracts in construction projects. Engineering, Construction and Architectural Management, 29(02), 989-1015.

Hung, Y-H, Smith-Jackson, T and Winchester, W (2011) Use of attitude congruence to identify safety interventions for small residential builders. Construction Management and Economics, 29(02), 113–30.

Katebi, A, Mohammadhosseini, A, Najmeddin, M and Homami, P (2024) The moderating impact of organizational readiness, competitive pressure and compatibility on the cost of using precast concrete components. Journal of Financial Management of Property and Construction, 29(02), 274-94.

Ketabi, A B and Heravi, G (2022) Developing a framework for evaluating construction project safety levels and optimal cost allocation to safety influential factors. Engineering, Construction and Architectural Management, 29(02), 643-68.

Kim, Y-W and Kim, S-C (2011) Cost analysis of information technology-assisted quality inspection using activity-based costing. Construction Management and Economics, 29(02), 163–72.

Larsson, N K (2001) iiSBE: the international initiative for sustainable built environment. Building Research & Information, 29(02), 175–7.

Leaman, A and Bordass, B (2001) Assessing building performance in use 4: technical performance of the Probe buildings. Building Research & Information, 29(02), 129–43.

Liu, A M M, Fellows, R and Tuuli, M M (2011) The role of corporate citizenship values in promoting corporate social performance: towards a conceptual model and a research agenda. Construction Management and Economics, 29(02), 173–83.

Loosemore, M and McCallum, A (2022) The situational and individual determinants of entrepreneurship in the construction industry. Engineering, Construction and Architectural Management, 29(02), 1038-60.

Loosemore, M, Alkilani, S Z and Hammad, A W A (2022) Barriers to employment for refugees seeking work in the Australian construction industry: an exploratory study. Engineering, Construction and Architectural Management, 29(02), 619-42.

Maheswari, J U, Mujumdar, P, Padala, S P S and Gwaskoti, A (2022) BDM–MDM integrated solution concept for scheduling information-driven projects. Engineering, Construction and Architectural Management, 29(02), 1016-37.

Mohammadi, S, Tavakolan, M and Zahraie, B (2022) An intelligent simulation-based framework for automated planning of concrete construction works. Engineering, Construction and Architectural Management, 29(02), 916-39.

Osei-Appiah, V K, Kissi, E, Karikari, V A, Ayeng, P, Danquah-Smith, E and Adesi, M (2024) Assessing the impact of early supplier involvement on public works procurement. Journal of Financial Management of Property and Construction, 29(02), 229-49.

Ríos-Fernández, J C (2022) Thermal performance assessment of cool roofs on supermarkets through case analysis in 13 cities. Engineering, Construction and Architectural Management, 29(02), 739-54.

Rajhans, R K (2024) How do economic policy uncertainty and leverage impact firm-level cash holding distribution of housing companies in an emerging economy? A quantile regression approach. Journal of Financial Management of Property and Construction, 29(02), 331-48.

Rathnayaka, L S D, Malsha Nadeetharu, B K and Kulatunga, U (2024) Applicability of electronic document management system (EDMS) for the cost management of mega construction projects in Sri Lanka. Journal of Financial Management of Property and Construction, 29(02), 314-30.

Scrase, J I (2001) Curbing the growth in UK commercial energy consumption. Building Research & Information, 29(02), 51–61.

Shah, M A, Kumar, S, Shah, M A and Rasool, A (2024) Examining the relationship among critical success factors (CSFs) for delivery of sustainable public-private partnership projects. Journal of Financial Management of Property and Construction, 29(02), 250-73.

Shalwani, A and Lines, B (2022) Using issue logs to improve construction project performance. Engineering, Construction and Architectural Management, 29(02), 896-915.

Sheamar, S, Wedawatta, G, Tennakoon, M, Palliyaguru, R and Antwi-Afari, M F (2024) The potential of new models of construction procurement to counter cost overruns in construction projects: an exploratory study from a contractors’ perspective. Journal of Financial Management of Property and Construction, 29(02), 211-28.

Silva, P M, Domingo, N and Ameer Ali, N A N (2024) Causes of disputes in the construction industry – a systematic literature review. Journal of Financial Management of Property and Construction, 29(02), 193-210.

Singla, H K and Chammanam, S S (2024) Development of a financial performance measurement model for real estate business: an exploratory study in India. Journal of Financial Management of Property and Construction, 29(02), 295-313.

Styhre, A (2011) In the circuit of credibility: construction workers and the norms of "a good job". Construction Management and Economics, 29(02), 199–209.

Teo, M M and Loosemore, M (2011) Community-based protest against construction projects: a case study of movement continuity. Construction Management and Economics, 29(02), 131–44.

Wahab, A and Wang, J (2022) Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation. Engineering, Construction and Architectural Management, 29(02), 702-15.

Wang, G, Liu, M, Cao, D and Tan, D (2022) Identifying high-frequency–low-severity construction safety risks: an empirical study based on official supervision reports in Shanghai. Engineering, Construction and Architectural Management, 29(02), 940-60.

Yang, J, Shen, P Q, Bourne, L, Ho, C M-F and Xue, X (2011) A typology of operational approaches for stakeholder analysis and engagement. Construction Management and Economics, 29(02), 145–62.

Zahoor, H, Khan, R M, Nawaz, A, Ayaz, M and Maqsoom, A (2022) Project control and forecast assessment of building projects in Pakistan using earned value management. Engineering, Construction and Architectural Management, 29(02), 842-69.

Zaryoun, M, Hosseini, M and Soleymani, K (2022) Sustainable architecture and earthquake resilience of vernacular Zegalli houses in northern Iran. Engineering, Construction and Architectural Management, 29(02), 1061-85.

Zimmerman, A and Martin, M (2001) Post-occupancy evaluation: benefits and barriers. Building Research & Information, 29(02), 168–74.

Zohrehvandi, S, Khalilzadeh, M, Amiri, M and Shadrokh, S (2022) Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. Engineering, Construction and Architectural Management, 29(02), 716-38.

Zou, X, Zhang, L and Zhang, Q (2022) Time-cost optimization in repetitive project scheduling with limited resources. Engineering, Construction and Architectural Management, 29(02), 669-701.