Adinyira, E, Adjei, E A G, Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using Support Vector Regression Algorithm (SVRA). Engineering, Construction and Architectural Management, 28(05), 1491-514.

Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(05), 1377-96.

Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(05), 315–24.

Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(05), 1397-422.

Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(05), 376–86.

Bon, R and Hutchinson, K (2000) Sustainable construction: some economic challenges. Building Research & Information, 28(05), 310–4.

Bordass, B (2000) Cost and value: fact and fiction. Building Research & Information, 28(05), 338–52.

Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(05), 368–75.

Das, P, Perera, S, Senaratne, S and Osei-Kyei, R (2021) Developing a construction business model transformation canvas. Engineering, Construction and Architectural Management, 28(05), 1423-39.

Heerwagen, J (2000) Green buildings, organizational success and occupant productivity. Building Research & Information, 28(05), 353–67.

Hydes, K R and Creech, L (2000) Reducing mechanical equipment cost: the economics of green design. Building Research & Information, 28(05), 403–7.

Ismail, Z A B (2021) Towards a BIM-based approach for improving maintenance performance in IBS building projects. Engineering, Construction and Architectural Management, 28(05), 1468-90.

  • Type: Journal Article
  • Keywords: BIM; ibs buildings; maintenance management process; Malaysia
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-07-2020-0508
  • Abstract:

    Purpose: The contemporary practice of conventional maintenance for industrialised building system (IBS) constructions suffers from poor service delivery and defect repetition. A key problem impeding the widespread adoption of emerging technologies is the lack of competent contractors to support the effectiveness of the technology implemented in conventional methods and to ensure returns on investment. The shortcomings of conventional methods are assessed from the perspective of IBS buildings. This paper aims to identify the different system approach using Building Information Modelling (BIM) technology that is equipped with decision making processes. Design/methodology/approach: This paper describes the establishment of key problem areas, the elements involved in implementing good practice and the requirements for integrating maintenance management processes and information databases in the maintenance management system. Findings: Conventional methods have little emphasis on defect diagnosis tools. They also enhance inadequate strategic decision-making in the analysis of information when attempting to improve the maintenance project outcomes for IBS construction. The characteristics identified in a case study of IBS buildings are presented and analysed. Originality/value: The conclusions and recommendations drawn from the analysis of the IBS case study are discussed, synthesised and deliberated upon. The approach presented in this paper integrates various aspects of building information modelling technology to facilitate improved execution of IBS maintenance activities.

Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(05), 527–43.

Larsson, N K and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(05), 413–8.

Lingard, H C, Francis, V and Turner, M (2010) Work–family enrichment in the Australian construction industry: implications for job design. Construction Management and Economics, 28(05), 467–80.

Malin, N (2000) The cost of green materials. Building Research & Information, 28(05), 408–12.

Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in Andalusia: application to construction and demolition waste management. Construction Management and Economics, 28(05), 495–507.

Ness, K (2010) The discourse of ‘Respect for People’ in UK construction. Construction Management and Economics, 28(05), 481–93.

Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(05), 509–26.

Papamichael, K (2000) Green building performance prediction/assessment. Building Research & Information, 28(05), 394–402.

Prabhakaran, A, Mahamadu, A M, Mahdjoubi, L, Manu, P, Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: an empirical study. Engineering, Construction and Architectural Management, 28(05), 1440-67.

Reed, W G and Gordon, E B (2000) Integrated design and building process: what research and methodologies are needed?. Building Research & Information, 28(05), 325–37.

Ross, N, Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(05), 433–49.

Sterner, E (2000) Life-cycle costing and its use in the Swedish building sector. Building Research & Information, 28(05), 387–93.