Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 25 results ...
Adinyira, E, Adjei, E A G, Agyekum, K and Fugar, F D K (2021) Application of machine learning in predicting construction project profit in Ghana using Support Vector Regression Algorithm (SVRA). Engineering, Construction and Architectural Management, 28(05), 1491-514.
- Type: Journal Article
- Keywords: cash flow; construction project; machine learning; productivity; profit; support vector regression
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-08-2020-0618
- Abstract:
Purpose: Knowledge of the effect of various cash-flow factors on expected project profit is important to effectively manage productivity on construction projects. This study was conducted to develop and test the sensitivity of a Machine Learning Support Vector Regression Algorithm (SVRA) to predict construction project profit in Ghana. Design/methodology/approach: The study relied on data from 150 institutional projects executed within the past five years (2014–2018) in developing the model. Eighty percent (80%) of the data from the 150 projects was used at hyperparameter selection and final training phases of the model development and the remaining 20% for model testing. Using MATLAB for Support Vector Regression, the parameters available for tuning were the epsilon values, the kernel scale, the box constraint and standardisations. The sensitivity index was computed to determine the degree to which the independent variables impact the dependent variable. Findings: The developed model’s predictions perfectly fitted the data and explained all the variability of the response data around its mean. Average predictive accuracy of 73.66% was achieved with all the variables on the different projects in validation. The developed SVR model was sensitive to labour and loan. Originality/value: The developed SVRA combines variation, defective works and labour with other financial constraints, which have been the variables used in previous studies. It will aid contractors in predicting profit on completion at commencement and also provide information on the effect of changes to cash-flow factors on profit.
Alade, K and Windapo, A O (2021) Developing effective 4IR leadership framework for construction organisations. Engineering, Construction and Architectural Management, 28(05), 1377-96.
Bartlett, E and Howard, N (2000) Informing the decision makers on the cost and value of green building. Building Research & Information, 28(05), 315–24.
Bhattacharya, S and Momaya, K S (2021) Actionable strategy framework for digital transformation in AECO industry. Engineering, Construction and Architectural Management, 28(05), 1397-422.
Bogenstätter, U (2000) Prediction and optimization of life-cycle costs in early design. Building Research & Information, 28(05), 376–86.
Bon, R and Hutchinson, K (2000) Sustainable construction: some economic challenges. Building Research & Information, 28(05), 310–4.
Bordass, B (2000) Cost and value: fact and fiction. Building Research & Information, 28(05), 338–52.
Cole, R J and Sterner, E (2000) Reconciling theory and practice of life-cycle costing. Building Research & Information, 28(05), 368–75.
Das, P, Perera, S, Senaratne, S and Osei-Kyei, R (2021) Developing a construction business model transformation canvas. Engineering, Construction and Architectural Management, 28(05), 1423-39.
Heerwagen, J (2000) Green buildings, organizational success and occupant productivity. Building Research & Information, 28(05), 353–67.
Hydes, K R and Creech, L (2000) Reducing mechanical equipment cost: the economics of green design. Building Research & Information, 28(05), 403–7.
Ismail, Z A B (2021) Towards a BIM-based approach for improving maintenance performance in IBS building projects. Engineering, Construction and Architectural Management, 28(05), 1468-90.
Jarkas, A M (2010) The influence of buildability factors on rebar fixing labour productivity of beams. Construction Management and Economics, 28(05), 527–43.
Larsson, N K and Clark, J (2000) Incremental costs within the design process for energy efficient buildings. Building Research & Information, 28(05), 413–8.
Lingard, H C, Francis, V and Turner, M (2010) Work–family enrichment in the Australian construction industry: implications for job design. Construction Management and Economics, 28(05), 467–80.
Malin, N (2000) The cost of green materials. Building Research & Information, 28(05), 408–12.
Marrero, M and Ramirez-De-Arellano, A (2010) The building cost system in Andalusia: application to construction and demolition waste management. Construction Management and Economics, 28(05), 495–507.
Ness, K (2010) The discourse of ‘Respect for People’ in UK construction. Construction Management and Economics, 28(05), 481–93.
Olawale, Y A and Sun, M (2010) Cost and time control of construction projects: inhibiting factors and mitigating measures in practice. Construction Management and Economics, 28(05), 509–26.
Papamichael, K (2000) Green building performance prediction/assessment. Building Research & Information, 28(05), 394–402.
Prabhakaran, A, Mahamadu, A M, Mahdjoubi, L, Manu, P, Che Ibrahim, C K I and Aigbavboa, C O (2021) The effectiveness of interactive virtual reality for furniture, fixture and equipment design communication: an empirical study. Engineering, Construction and Architectural Management, 28(05), 1440-67.
Reed, W G and Gordon, E B (2000) Integrated design and building process: what research and methodologies are needed?. Building Research & Information, 28(05), 325–37.
Ross, N, Bowen, P A and Lincoln, D (2010) Sustainable housing for low-income communities: lessons for South Africa in local and other developing world cases. Construction Management and Economics, 28(05), 433–49.
Sterner, E (2000) Life-cycle costing and its use in the Swedish building sector. Building Research & Information, 28(05), 387–93.
Tuuli, M M, Rowlinson, S and Koh, T Y (2010) Control modes and mechanisms in construction project teams: drivers and consequences. Construction Management and Economics, 28(05), 451–65.