Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 30 results ...

Adzivor, E K, Emuze, F and Das, D K (2023) Indicators for safety culture in SME construction firms: a Delphi study in Ghana. Journal of Financial Management of Property and Construction, 28(03), 293-316.

Badenfelt, U (2010) I trust you, I trust you not: a longitudinal study of control mechanisms in incentive contracts. Construction Management and Economics, 28(03), 10.

Bradley, P E (2010) An ultrametric interpretation of building related event data. Construction Management and Economics, 28(03), 26.

Chao, L-C (2010) Estimating project overheads rate in bidding: DSS approach using neural networks. Construction Management and Economics, 28(03), 99.

Chen, H, Jin, Z, Su, Q and Yue, G (2021) The roles of captains in megaproject innovation ecosystems: the case of the Hong Kong‐Zhuhai‐Macau Bridge. Engineering, Construction and Architectural Management, 28(03), 662-80.

Costa, M and Lisboa, I (2023) Default prediction of small and medium enterprises: Portuguese construction sector. Journal of Financial Management of Property and Construction, 28(03), 439-58.

Fan, R Y C, Ng, S T and Wong, J M W (2010) Reliability of the Box–Jenkins model for forecasting construction demand covering times of economic austerity. Construction Management and Economics, 28(03), 54.

Fernando, S, Panuwatwanich, K and Thorpe, D (2021) Introducing an innovation promotion model for construction projects. Engineering, Construction and Architectural Management, 28(03), 728-46.

Gorod, A, Hallo, L, Statsenko, L, Nguyen, T and Chileshe, N (2021) Integrating hierarchical and network centric management approaches in construction megaprojects using a holonic methodology. Engineering, Construction and Architectural Management, 28(03), 627-61.

Hu, X, Nor, E and Hooy, C W (2023) Do political connections cause over-indebtedness? Empirical evidence from China’s listed construction firms. Journal of Financial Management of Property and Construction, 28(03), 477-97.

Jewell, C, Flanagan, R and Anaç, C (2010) Understanding UK construction professional services exports: definitions and characteristics. Construction Management and Economics, 28(03), 9.

Jiang, W, Ding, L and Zhou, C (2021) Cyber physical system for safety management in smart construction site. Engineering, Construction and Architectural Management, 28(03), 788-808.

Jones, S M, Ross, A and Sertyesilisik, B (2010) Testing the unfolding model of voluntary turnover on construction professionals. Construction Management and Economics, 28(03), 85.

Lawal, H S, Ahmadu, H A, Abdullahi, M, Yamusa, M A and Abdulrazaq, M (2023) Modeling duration of building renovation projects. Journal of Financial Management of Property and Construction, 28(03), 423-38.

Liu, H, Yu, Y, Sun, Y and Yan, X (2021) A system dynamic approach for simulation of a knowledge transfer model of heterogeneous senders in mega project innovation. Engineering, Construction and Architectural Management, 28(03), 681-705.

Liu, Y, Amini-Abyaneh, A, Hertogh, M, Houwing, E J and Bakker, H (2021) Collaborate to learn and learn to collaborate: a case of exploitative learning in the inter-organizational project. Engineering, Construction and Architectural Management, 28(03), 809-30.

Lowe, R (2000) Defining and meeting the carbon constraints of the 21st century. Building Research & Information, 28(03), 159–75.

Machado, M V, Roche, P M L, Mustieles, F and Oteiza, I d (2000) The fourth house: the design of a bio climatic house in Venezuela. Building Research & Information, 28(03), 196–211.

MacIntyre, S, McCord, M, Davis, P T, Zacharopoulos, A and McCord, J A (2023) A spatial examination of solar PV adopters in Northern Ireland: the role of housing market and socio-economic characteristics. Journal of Financial Management of Property and Construction, 28(03), 317-50.

Okanlawon, T T, Oyewobi, L O and Jimoh, R A (2023) Evaluation of the drivers to the implementation of blockchain technology in the construction supply chain management in Nigeria. Journal of Financial Management of Property and Construction, 28(03), 459-76.

Pellegrini-Masini, G, Bowles, G, Peacock, A D, Ahadzi, M and Banfill, P F G (2010) Whole life costing of domestic energy demand reduction technologies: householder perspectives. Construction Management and Economics, 28(03), 29.

Saka, N and Arowoiya, V (2023) An assessment of the linkages between the construction and other sectors of the Nigerian economy. Journal of Financial Management of Property and Construction, 28(03), 351-73.

Sang, L, Yu, M, Lin, H, Zhang, Z and Jin, R (2021) Big data, technology capability and construction project quality: a cross-level investigation. Engineering, Construction and Architectural Management, 28(03), 706-27.

  • Type: Journal Article
  • Keywords: big data; hierarchical linear model; project quality; team governance; technology capability
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/ECAM-02-2020-0135
  • Abstract:

    Purpose: Embracing big data has been at the forefront of research for project management. Although there is a consensus that the adoption of big data has significantly positive impact on project performance, far less is known about how this innovative information technology becomes an effective driver of construction project quality improvement. This study aims to better understand the mechanism and conditions under which big data can effectively improve project quality performance. Design/methodology/approach: Adopting Chinese construction enterprises as samples, the theoretical framework proposed in this paper is verified by the empirical results of the two-level hierarchical linear model. The moderated mediation analysis is also conducted to test the hypotheses. Finally, the empirical findings are validated by a comparative case study. Findings: The results show that big data facilitates the development of technology capability, which further produces remarkable quality performance. That is, a project team’s technology capability acts as a mediator in the relationship between organizational adaptability of big data and predictive analytics and project quality performance. It is also observed that two types of project team interdependence (goal and task interdependence) positively moderate the mediation effect. Research limitations/implications: The questionnaire study from China only represents the relationship within a short time interval in the current context. Future studies should apply longitudinal designs to properly test the causality and use multiple data sources to ensure the validity and robustness of the conclusions. Practical implications: The value of big data in terms of quality improvement could not be determined in a vacuum; it also depends on the internal capability development and elaborate design of project governance. Originality/value: This study provides an extension of the existing big data studies and fuels the ongoing debate on its actual outcomes in project management. It not only clarifies the direct effect of big data on project quality improvement but also identifies the mechanism and conditions under which the adoption of big data can play an effective role.

Smyth, H (2010) Construction industry performance improvement programmes: the UK case of demonstration projects in the ‘Continuous Improvement’ programme. Construction Management and Economics, 28(03), 70.

Stewardson, A, Edwards, D J, Asamoah, E, Aigbavboa, C O, Lai, J H K and El-Gohary, H (2023) The late payment epidemic in UK construction. Journal of Financial Management of Property and Construction, 28(03), 374-97.

Thilakarathne, N, Rathnasinghe, A P, Kulatunga, U, Thurairajah, N and Weerasinghe, L (2023) An investigation of the conflict management strategies in international construction joint ventures of Sri Lanka. Journal of Financial Management of Property and Construction, 28(03), 273-92.

Thormark, C (2000) Including recycling potential in energy use into the life cycle of buildings. Building Research & Information, 28(03), 176–83.

Treloar, G J, Fay, R, Love, P E D and Iyer-Raniga, U (2000) Analysing the life-cycle energy of an Australian residential building and its householders. Building Research & Information, 28(03), 184–95.

Zeng, R, Chini, A and Ries, R (2021) Innovative design for sustainability: Integrating embodied impacts and costs during the early design phase. Engineering, Construction and Architectural Management, 28(03), 747-64.

Zhang, J, Li, H, Li, V, Xia, B and Skitmore, M (2021) Internal relationships of market-oriented EFQM enablers in the Chinese construction industry. Engineering, Construction and Architectural Management, 28(03), 765-87.