Abdul-Aziz, A-R and Wong, S S (2010) Exploring the internationalization of Malaysian contractors: the international entrepreneurship dimension. Construction Management and Economics, 28(01), 61.
Abdullah, S, Abdul Wahab, M R, Abdul Razak, A and Hanafi, M H (2023) Property taxation: the encouraging factors for payment among the taxpayers. Journal of Financial Management of Property and Construction, 28(01), 22-44.
Alshorafa, R and Ergen, E (2021) Determining the level of development for BIM implementation in large-scale projects: A multi-case study. Engineering, Construction and Architectural Management, 28(01), 397-423.
Atkinson, R J, Tennakoon, M and Wedawatta, G (2023) Use of new models of construction procurement to enhance collaboration in construction projects: the UK construction industry perspective. Journal of Financial Management of Property and Construction, 28(01), 45-63.
Bello, N A, Abdullahi, B C, Atilola, M I and Thontteh, E O (2023) Review of the methodological approach of analysing rental income of residential property in Abuja, Nigeria. Journal of Financial Management of Property and Construction, 28(01), 107-26.
Chow, L K and Ng, S T (2010) Delineating the performance standards of engineering consultants at design stage. Construction Management and Economics, 28(01), 11.
Davies, M, Jackaway, A, Hardy, R, Dewey, E and Littler, J (2000) A translucent louvre system: design concepts, modelling work and monitored data. Building Research & Information, 28(01), 42–50.
Fay, R, Treloar, G and Iyer-Raniga, U (2000) Life-cycle energy analysis of buildings: a case study. Building Research & Information, 28(01), 31–41.
Hallowell, M (2010) Cost-effectiveness of construction safety programme elements. Construction Management and Economics, 28(01), 34.
Hasan, A, Ahn, S, Rameezdeen, R and Baroudi, B (2021) Investigation into post-adoption usage of mobile ICTs in Australian construction projects. Engineering, Construction and Architectural Management, 28(01), 351-71.
Hatmoko, J U D and Scott, S (2010) Simulating the impact of supply chain management practice on the performance of medium-sized building projects. Construction Management and Economics, 28(01), 49.
Heravi, G, Kebria, M F and Rostami, M (2021) Integrating the production and the erection processes of pre-fabricated steel frames in building projects using phased lean management. Engineering, Construction and Architectural Management, 28(01), 174-95.
Indomo, I L and Lubis, A W (2023) Capital structure behaviour among Indonesian property developers during different business cycles. Journal of Financial Management of Property and Construction, 28(01), 91-106.
Jacobsson, M and Linderoth, H C J (2010) The influence of contextual elements, actors’ frames of reference, and technology on the adoption and use of ICT in construction projects: a Swedish case study. Construction Management and Economics, 28(01), 23.
Jensen, D A (2010) A longitudinal study of a Type I differing conditions claim: investigating the contractor’s failure to meet the reasonable prudent standard. Construction Management and Economics, 28(01), 74.
Jiang, W and Zhao, X (2021) Trust and the intent to cooperate in energy performance contracting for public buildings in China. Engineering, Construction and Architectural Management, 28(01), 372-96.
Jiang, W, Martek, I, Hosseini, M R and Chen, C (2021) Political risk management of foreign direct investment in infrastructure projects: Bibliometric-qualitative analyses of research in developing countries. Engineering, Construction and Architectural Management, 28(01), 125-53.
Juan, Y K, Chi, H Y and Chen, H H (2021) Virtual reality-based decision support model for interior design and decoration of an office building. Engineering, Construction and Architectural Management, 28(01), 229-45.
Khelil, I, Guidara, A and Khlif, H (2023) The effect of the strength of auditing and reporting standards on infrastructure quality in Africa: do ethical behaviour of firms and judicial independence matter?. Journal of Financial Management of Property and Construction, 28(01), 145-60.
Li, Y, He, N, Li, H, Liu, Z and Qi, J (2021) Influencing factors on inter-organizational trust asymmetry behavior in construction projects: Evidence from China. Engineering, Construction and Architectural Management, 28(01), 308-31.
Li, Y, Lin, J, Cui, Z, Wang, C and Li, G (2021) Workforce productivity evaluation of the US construction industry from 2006 to 2016. Engineering, Construction and Architectural Management, 28(01), 55-81.
Liu, L and Napier, Z (2010) The accuracy of risk-based cost estimation for water infrastructure projects: preliminary evidence from Australian projects. Construction Management and Economics, 28(01), 100.
- Type: Journal Article
- Keywords: cost estimating; forecasting; accuracy; risk-based estimating; fixed contingency approach
- ISBN/ISSN: 0144-6193
- URL: https://doi.org/10.1080/01446190903431525
- Abstract:
Infrastructure projects are still being plagued by cost overruns, delays and revenue shortfalls despite decades of practice and research. Risk-based estimating (RBE) is growing in popularity and has the potential to overcome the two main cost overrun factors—optimistic bias and strategic misrepresentation. Yet, little is known about the accuracy of RBE and its performance drivers. A comparison of water projects using RBE with a sample of construction projects using the conventional estimating approach shows that the projects estimated using RBE have better estimation accuracy than those estimated using more conventional approaches. In addition, the projects using RBE appear more likely to be under-budget while the ones using the conventional approach appear more likely to be over-budget. Further, through interviews and observations of the RBE process, three main performance drivers for the RBE method were identified to include outside view/collective experience, attention focusing and probabilistic, bottom-up modelling.
Low, S P, Gao, S and Ng, E W L (2021) Future-ready project and facility management graduates in Singapore for industry 4.0: Transforming mindsets and competencies. Engineering, Construction and Architectural Management, 28(01), 270-90.
Luo, J and Gale, A (2000) The evolution of the Chinese construction industry. Building Research & Information, 28(01), 51–8.
Ma, Z, Chong, H Y and Liao, P C (2021) Development of a time-variant causal model of human error in construction with dynamic Bayesian network. Engineering, Construction and Architectural Management, 28(01), 291-307.
Oliveros-Romero, J and Paton-Cole, V P (2023) Infrastructure development: reflections on Sierra Leone infrastructure scheme and the Lungi Bridge project. Journal of Financial Management of Property and Construction, 28(01), 127-44.
Omotayo, T S, Danvers-Watson, O and Oyegoke, A S (2023) Subcontractor trust issues on payment and valuation practices in UK private projects. Journal of Financial Management of Property and Construction, 28(01), 64-90.
Ramani, P V and Ksd, L K L (2021) Application of lean in construction using value stream mapping. Engineering, Construction and Architectural Management, 28(01), 216-28.
Sha, K, Deng, X and Cui, C (2000) Sustainable construction in China: status quo and trends. Building Research & Information, 28(01), 59–66.
Sharma, K K, Israel, D and Bhalla, B (2021) Does previous work experience matter in students’ learning in higher project management education?. Engineering, Construction and Architectural Management, 28(01), 424-50.
Sinha, A K and Jha, K N (2021) Financing constraints of public–private partnership projects in India. Engineering, Construction and Architectural Management, 28(01), 246-69.
Slaughter, E S (2000) Implementation of construction innovations. Building Research & Information, 28(01), 2–17.
Vijverberg, G (2000) Basing maintenance needs on accommodation policy. Building Research & Information, 28(01), 18–30.
Wang, T, Abdallah, M, Clevenger, C and Monghasemi, S (2021) Time–cost–quality trade-off analysis for planning construction projects. Engineering, Construction and Architectural Management, 28(01), 82-100.
Wang, Y and Jin, X (2021) Structural risk of diversified project financing of city investment company in China based on the best worst method. Engineering, Construction and Architectural Management, 28(01), 196-215.
Wu, G, Hu, Z, Zheng, J, Zhao, X and Zuo, J (2021) Effects of structure characteristics of project network on conflicts and project success. Engineering, Construction and Architectural Management, 28(01), 101-24.
Xiang, L, Tan, Y, Jin, X and Shen, G (2021) Understanding stakeholders' concerns of age-friendly communities at the briefing stage: a preliminary study in urban China. Engineering, Construction and Architectural Management, 28(01), 31-54.
Yang, W, Firouzi, A and Li, C Q (2023) Risk transfer in project finance loans for toll road using credit default swaps. Journal of Financial Management of Property and Construction, 28(01), 1-21.
Zhang, H and Li, H (2010) Multi-objective particle swarm optimization for construction time-cost tradeoff problems. Construction Management and Economics, 28(01), 88.