Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 23 results ...
Aka, A, Isah, A D, Eze, C J and Timileyin, O (2019) Application of lean manufacturing tools and techniques for waste reduction in Nigerian bricks production process. Engineering, Construction and Architectural Management, 27(03), 658–79.
Andary, E G, Abi Shdid, C, Chowdhury, A and Ahmad, I (2019) Integrated project delivery implementation framework for water and wastewater treatment plant projects. Engineering, Construction and Architectural Management, 27(03), 609–33.
Ball, R (1999) Developers, regeneration and sustainability issues in the re-use of vacant industrial buildings. Building Research & Information, 27(03), 140–8.
Christodoulou, S E, Ellinas, G N and Aslani, P (2009) Disorder considerations in resource-constrained scheduling. Construction Management and Economics, 27(03), 229–40.
Gambo, M J (2022) Effect of institutional context and finance context of housing finance on home ownership among low-income earners in Bauchi. Journal of Financial Management of Property and Construction, 27(03), 415-36.
Golizadeh, H, Hosseini, M R, Martek, I, Edwards, D, Gheisari, M, Banihashemi, S and Zhang, J (2019) Scientometric analysis of research on “remotely piloted aircraft”. Engineering, Construction and Architectural Management, 27(03), 634–57.
Gravina da Rocha, C, El Ghoz, H B and Jr Guadanhim, S (2019) A model for implementing product modularity in buildings design. Engineering, Construction and Architectural Management, 27(03), 680–99.
Halliday, S, Beggs, C and Muneer, T (1999) Is solar air conditioning feasible?. Building Research & Information, 27(03), 149–64.
- Type: Journal Article
- Keywords: air conditioning; alternative technology; desiccant; efficiency; energy; passive design; solar
- ISBN/ISSN: 0961-3218
- URL: http://journalsonline.tandf.co.uk/link.asp?id=twwcrmf6wcknqlb4
- Abstract:
The feasibility of desiccant cooling in UK climates is examined, using gas -solar hybrid technology for regeneration. Desiccant cooling is a heat driven system. It has potential to reduce energy costs and environmental pollution, when compared with conventional vapour compression systems. The regeneration of the desiccant can be provided by any low temperature warm air or water source including waste heat, CHP, gas or solar. Heat recovery is also available. Gaia Research worked with Napier University to develop computer codes for the simulation of solar energy collection and hot water delivery to drive the desiccant cooling system, based on real meteorological data. A solar desiccant computer model was developed with the University of Leeds, which analysed the energy consumption and costs associated with desiccant cooling using meteorological data for an inner London site in 1994. The study demonstrates that coupling the desiccant system to solar collectors produces significant savings in both running cost and CO2 emissions. The existing models of solar contribution and desiccant cooling will be refined. This will enable an assessment to be made of the UK opportunities for energy conservation and CO2 emission reduction in relation to latitude, internal design conditions, and real loads.
Hui, E C-M and Fung, H H-K (2009) Real estate development as real options. Construction Management and Economics, 27(03), 221–7.
Jia, Y A, Rowlinson, S, Kvan, T, Lingard, H C and Yip, B (2009) Burnout among Hong Kong Chinese architecture students: the paradoxical effect of Confucian conformity values. Construction Management and Economics, 27(03), 287–98.
Leiringer, R, Green, S D and Raja, J Z (2009) Living up to the value agenda: the empirical realities of through-life value creation in construction. Construction Management and Economics, 27(03), 271–85.
Liao, L, Teo Ai Lin, E and Low, S P (2019) Assessing building information modeling implementation readiness in building projects in Singapore. Engineering, Construction and Architectural Management, 27(03), 700–24.
Liu, Q, Ye, G and Feng, Y (2019) Workers’ safety behaviors in the off-site manufacturing plant. Engineering, Construction and Architectural Management, 27(03), 765–84.
Marsh, L E and Finch, E F (1999) Using portable datafiles in the construction supply chain. Building Research & Information, 27(03), 127–39.
Mwamila, B L M and Karumuna, B L (1999) Semi-prefabrication concrete techniques in developing countries. Building Research & Information, 27(03), 165–82.
Ping Ho, S, Lin, Y-H, Wu, H-L and Chu, W (2009) Empirical test of a model for organizational governance structure choices in construction joint ventures. Construction Management and Economics, 27(03), 315–24.
Pulket, T and Arditi, D (2009) Construction litigation prediction system using ant colony optimization. Construction Management and Economics, 27(03), 241–51.
Rodriguez, F S, Spilski, J, Hekele, F, Beese, N O and Lachmann, T (2019) Physical and cognitive demands of work in building construction. Engineering, Construction and Architectural Management, 27(03), 745–64.
Toor, S-U-R and Ofori, G (2009) Authenticity and its influence on psychological well-being and contingent self-esteem of leaders in Singapore construction sector. Construction Management and Economics, 27(03), 299–313.
Vahdatmanesh, M, Firouzi, A and Rotimi, J O B (2022) Real options analysis of revenue risk sharing in post-disaster housing reconstruction. Journal of Financial Management of Property and Construction, 27(03), 281-305.
Xu, Y and Turkan, Y (2019) BrIM and UAS for bridge inspections and management. Engineering, Construction and Architectural Management, 27(03), 785–807.
Yuan, J, Zeng, A Y, Skibniewski, M J and Li, Q (2009) Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money. Construction Management and Economics, 27(03), 253–70.
Zarghami, S A and Gunawan, I (2019) A fuzzy-based vulnerability assessment model for infrastructure networks incorporating reliability and centrality. Engineering, Construction and Architectural Management, 27(03), 725–44.