Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 42 results ...

Adedokun, O, Aje, I, Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context?. Journal of Financial Management of Property and Construction, 27(02), 259-78.

Adinyira, E, Agyekum, K, Manu, P, Mahamadu, A M and Olomolaiye, P (2022) Lessening procurement deviations using procurement post reviews: evidence from Ghana. Journal of Financial Management of Property and Construction, 27(02), 199-219.

Amadi, C, Carrillo, P and Tuuli, M (2019) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.

Amadi, C, Carrillo, P and Tuuli, M (2020) PPP projects: Improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544-60.

Burford, N K and Smith, F W (1999) Developing a new military shelter system: a technical study in advanced materials and structures. Building Research & Information, 27(02), 64–83.

  • Type: Journal Article
  • Keywords: material; composite material; lightweight structure; reinforced plastic; shelter; tent; thermosetting plastic
  • ISBN/ISSN: 0961-3218
  • URL: http://taylorandfrancis.metapress.com/link.asp?id=p48rlw2qvkbqqgc3
  • Abstract:
    The development of a new lightweight military shelter system is based on an unusual composite structural system utilizing the innovative use of pultrusion production techniques for plastic. The authors report on the combined development of both the structural system and the components, which are made from linear pultruded sections of reinforced plastic, and an anticlastic stressed membrane. The shelter comprises a 'kit' of purpose-designed components, which are used to fulfill the multiple requirements of the shelter brief. This has resulted in a smaller number of component parts, less weight and enhanced ease of fabrication and assembly. Some of the techniques used in the design of components and parts indicate an alternative approach to the use of plastics in building construction.

Deep, S, Bhoola, V, Verma, S and Ranasinghe, U (2022) Identifying the risk factors in real estate construction projects: an analytical study to propose a control structure for decision-making. Journal of Financial Management of Property and Construction, 27(02), 220-38.

Dehdasht, G, Ferwati, M S, Abidin, N Z and Oyedeji, M O (2022) Trends of construction industry in Malaysia and its emerging challenges. Journal of Financial Management of Property and Construction, 27(02), 161-78.

Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.

Horne, M, Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(02), 96–108.

Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2019) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.

Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2020) Site planning and design of green residential building projects: Case studies in China. Engineering, Construction and Architectural Management, 27(02), 525-43.

Hyung, W G, Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561-78.

Hyung, W, Kim, S and Jo, J (2019) Improved similarity measure in case-based reasoning: a case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561–78.

Johari, S and Jha, K N (2019) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.

Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321-40.

Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(02), 84–95.

Li, X K, Wang, X M and Lei, L (2020) The application of an ANP-fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356-84.

Li, X, Wang, X and Lei, L (2019) The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356–84.

Mallisetti, V, Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects – the Indian case. Journal of Financial Management of Property and Construction, 27(02), 179-98.

Mellado, F, Lou, E C and Becerra, C L C (2019) Synthesising performance in the construction industry. Engineering, Construction and Architectural Management, 27(02), 579–608.

Mellado, F, Lou, E C W and Becerra, C L C (2020) Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Engineering, Construction and Architectural Management, 27(02), 579-608.

Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.

Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2019) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.

Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.

Oyegoke, A S, Powell, R, Ajayi, S, Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(02), 141-60.

Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: a comparative investigation. Building Research & Information, 27(02), 109–19.

Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.

Rohman, M A (2022) Assessment of the government’s role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(02), 239-58.

Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.

Salvado, F, Almeida, N and Vale e Azevedo, A (2019) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441–57.

Salvado, F, Almeida, N and Vale e Azevedo, A (2020) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441-57.

van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.

Wang, X, Shi, L, Wang, B and Kan, M (2019) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483–501.

Wang, X, Shi, L, Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483-501.

Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.

Wei, H, Minggang, H and Qun, H (1999) Quasi-static testing of composite masonry construction. Building Research & Information, 27(02), 120–3.

Yevu, S K and Yu, A T W (2019) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.

Zarghami, S A and Gunawan, I (2019) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.

Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2019) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458–82.

Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2020) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458-82.

Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2019) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.

Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502-24.