Adedokun, O, Aje, I, Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context?. Journal of Financial Management of Property and Construction, 27(02), 259-78.
Adinyira, E, Agyekum, K, Manu, P, Mahamadu, A M and Olomolaiye, P (2022) Lessening procurement deviations using procurement post reviews: evidence from Ghana. Journal of Financial Management of Property and Construction, 27(02), 199-219.
- Type: Journal Article
- Keywords: Ghana; procurement post review; procurement risk; world bank
- ISBN/ISSN:
- URL: https://doi.org/10.1108/JFMPC-05-2020-0038
- Abstract:
Purpose: Multilateral aid agencies generate most of their funds from taxpayers, and therefore, it is necessary to ensure that recipients or borrowers use the funds for the intended purposes. The World Bank is one of the major multilateral aid agencies that fund infrastructure projects in developing countries. Like other multilateral aid agencies, the World Bank uses oversight instruments/auditing tools to manage procurement risk on their funded projects. However, empirical insight about the effectiveness of these auditing tools is limited. This paper aims to assess the effectiveness of one of such multilateral aid agencies’ auditing tools (i.e. World Bank’s procurement post review [PPR]) in procurement risk mitigation on funded projects in a developing country context. Design/methodology/approach: The study is based on secondary data obtained from the World Bank PPR reports carried out in the 2014, 2015 and 2016 financial years. Five projects with the highest loan amounts and five with the lowest loan amounts for the three-year period were selected from the 24 active World Bank projects during the time of the study. A purposive sampling technique was used to select a representative sample from a list of contracts under the 10 projects. Findings: The results of the analysis showed a clear decline in the number of both major and minor deviations over the three-year period while an increase in the number of contracts with “No Deviation”. The study therefore concludes that procurement risk experienced a decline amongst the World Bank projects in Ghana where post reviews were carried out on yearly basis. Originality/value: The study identifies the need for more frequent PPR and makes a case for the need to investigate whether PPR is a superior auditing tool compared to the other tools. © 2021, Emerald Publishing Limited.
Amadi, C, Carrillo, P and Tuuli, M (2020) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.
Burford, N K and Smith, F W (1999) Developing a new military shelter system: a technical study in advanced materials and structures. Building Research & Information, 27(02), 64–83.
Deep, S, Bhoola, V, Verma, S and Ranasinghe, U (2022) Identifying the risk factors in real estate construction projects: an analytical study to propose a control structure for decision-making. Journal of Financial Management of Property and Construction, 27(02), 220-38.
Dehdasht, G, Ferwati, M S, Abidin, N Z and Oyedeji, M O (2022) Trends of construction industry in Malaysia and its emerging challenges. Journal of Financial Management of Property and Construction, 27(02), 161-78.
Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.
Horne, M, Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(02), 96–108.
Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2020) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.
Hyung, W G, Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561-78.
Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.
Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(02), 84–95.
Li, X K, Wang, X M and Lei, L (2020) The application of an ANP-fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356-84.
Mallisetti, V, Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects – the Indian case. Journal of Financial Management of Property and Construction, 27(02), 179-98.
Mellado, F, Lou, E C W and Becerra, C L C (2020) Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Engineering, Construction and Architectural Management, 27(02), 579-608.
Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.
Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2020) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.
Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.
Oyegoke, A S, Powell, R, Ajayi, S, Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(02), 141-60.
Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: a comparative investigation. Building Research & Information, 27(02), 109–19.
Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.
Rohman, M A (2022) Assessment of the government’s role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(02), 239-58.
Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.
Salvado, F, Almeida, N and Vale e Azevedo, A (2020) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441-57.
van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.
Wang, X, Shi, L, Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483-501.
Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.
Wei, H, Minggang, H and Qun, H (1999) Quasi-static testing of composite masonry construction. Building Research & Information, 27(02), 120–3.
Yevu, S K and Yu, A T W (2020) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.
Zarghami, S A and Gunawan, I (2020) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.
Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2020) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458-82.
Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.