Adedokun, O, Aje, I, Awodele, O and Egbelakin, T (2022) Are the public tertiary education building projects devoid of risks in the Nigerian construction context?. Journal of Financial Management of Property and Construction, 27(02), 259-78.
- Type: Journal Article
- Keywords: construction in developing countries; construction industry; education building projects; Nigeria; risk factors; tertiary institutions
- ISBN/ISSN:
- URL: https://doi.org/10.1108/JFMPC-01-2021-0002
- Abstract:
Purpose: The non-performance of construction projects in meeting the set objectives has continued to draw researchers worldwide. Despite this, little attention is accorded to public tertiary education building projects in Nigeria. Therefore, on this background, this study aims to assess the perceptions of stakeholders on the level of occurrence of risk factors in the public tertiary education building projects (TEBP) to enhance the performance of these projects. Design/methodology/approach: The study adopted a quantitative method of data collection via a questionnaire survey. In total, 452 questionnaires were administered to the respondents comprising client representatives, consultants (quantity surveyors, architects, services and structural engineers and builders) and the contractor. The respondents were involved in the conception and execution of TEBP across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and found suitable for analysis, indicating a 61.73% response rate. The reliability analysis for the research instrument was 0.965 via the Cronbach α test, indicating the high reliability of the instrument used for the data collection. Moreover, the clusters of risk factors also had reliability values that ranged between 0.719 and 0.875. Findings: The study found inflation, delayed payments in contracts, high competition bids, delay in work progress and occurrence of variations are the most frequently occurring risk factors in public TEBP. By contrast, difficulty to access the site, environmental factors and pollution were found to be low-weighted risks with the least likelihood of occurrence. The results of this study indicated the existence of significant differences in some of the risk factors in terms of the level of risk occurrence in TEBP. The risk factors were eventually clustered into eight major groups for TEBP. The post hoc comparisons using the least significant difference test also indicated differences between the contractors and consultants in the ranking of risks occurrence in TEBP, but no significant differences between clients/contractors and clients/consultants. Research limitations/implications: The findings in this study are limited to the public TEBP procured via competitive tendering; therefore, the results might not be applicable when other procurement methods are being considered. Besides, the study classified the project participants based on organizations and not on the different ownership status of the projects, such as federal or state government-owned TEBP. However, the literature shows that likelihood of risk occurrence could vary due to the degree of project ownership. Practical implications: The information provided with respect to the most frequently occurring risk factors would enhance the performance of public TEBP. Originality/value: This study contributes to the existing body of knowledge on the subject within a previously unexplored context where insights were provided on the most frequently occurring risk factors on the public TEBP. © 2021, Emerald Publishing Limited.
Adinyira, E, Agyekum, K, Manu, P, Mahamadu, A M and Olomolaiye, P (2022) Lessening procurement deviations using procurement post reviews: evidence from Ghana. Journal of Financial Management of Property and Construction, 27(02), 199-219.
Amadi, C, Carrillo, P and Tuuli, M (2020) PPP projects: improvements in stakeholder management. Engineering, Construction and Architectural Management, 27(02), 544–60.
Burford, N K and Smith, F W (1999) Developing a new military shelter system: a technical study in advanced materials and structures. Building Research & Information, 27(02), 64–83.
Deep, S, Bhoola, V, Verma, S and Ranasinghe, U (2022) Identifying the risk factors in real estate construction projects: an analytical study to propose a control structure for decision-making. Journal of Financial Management of Property and Construction, 27(02), 220-38.
Dehdasht, G, Ferwati, M S, Abidin, N Z and Oyedeji, M O (2022) Trends of construction industry in Malaysia and its emerging challenges. Journal of Financial Management of Property and Construction, 27(02), 161-78.
Elazouni, A (2009) Heuristic method for multi-project finance-based scheduling. Construction Management and Economics, 27(02), 199–211.
Horne, M, Hill, R and Giddings, R (1999) Visualization of photovoltaic clad buildings. Building Research & Information, 27(02), 96–108.
Huo, X, Yu, A T W, Zezhou, W and Jayantha, W M (2020) Site planning and design of green residential building projects: case studies in China. Engineering, Construction and Architectural Management, 27(02), 525–43.
Hyung, W G, Kim, S and Jo, J K (2020) Improved similarity measure in case-based reasoning: A case study of construction cost estimation. Engineering, Construction and Architectural Management, 27(02), 561-78.
Johari, S and Jha, K N (2020) Challenges of attracting construction workers to skill development and training programmes. Engineering, Construction and Architectural Management, 27(02), 321–40.
Lam, K C and Chow, W S (1999) The significance of financial risks in BOT procurement. Building Research & Information, 27(02), 84–95.
Li, X K, Wang, X M and Lei, L (2020) The application of an ANP-fuzzy comprehensive evaluation model to assess lean construction management performance. Engineering, Construction and Architectural Management, 27(02), 356-84.
Mallisetti, V, Dolla, T and Laishram, B (2022) Unpacking the framework of unsolicited proposal for public private partnership projects – the Indian case. Journal of Financial Management of Property and Construction, 27(02), 179-98.
Mellado, F, Lou, E C W and Becerra, C L C (2020) Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement. Engineering, Construction and Architectural Management, 27(02), 579-608.
Ng, S T, Fan, R Y C, Wong, J M W, Chan, A P C, Chiang, Y H, Lam, P T I and Kumaraswamy, M (2009) Coping with structural change in construction: experiences gained from advanced economies. Construction Management and Economics, 27(02), 165–80.
Nwaogu, J M, Chan, A P, Hon, C K and Darko, A (2020) Review of global mental health research in the construction industry. Engineering, Construction and Architectural Management, 27(02), 385–410.
Ofori, G and Toor, S-U-R (2009) Research on cross-cultural leadership and management in construction: a review and directions for future research. Construction Management and Economics, 27(02), 119–33.
Oyegoke, A S, Powell, R, Ajayi, S, Godawatte, G A G R and Akenroye, T (2022) Factors affecting the selection of effective cost control techniques in the UK construction industry. Journal of Financial Management of Property and Construction, 27(02), 141-60.
Proverbs, D G, Holt, G D and Olomolaiye, P O (1999) Factors in formwork selection: a comparative investigation. Building Research & Information, 27(02), 109–19.
Robinson, H S and Scott, J (2009) Service delivery and performance monitoring in PFI/PPP projects. Construction Management and Economics, 27(02), 181–97.
Rohman, M A (2022) Assessment of the government’s role performance in public-private partnership (PPP) toll road projects in Indonesia. Journal of Financial Management of Property and Construction, 27(02), 239-58.
Rosenfeld, Y (2009) Cost of quality versus cost of non-quality in construction: the crucial balance. Construction Management and Economics, 27(02), 107–17.
Salvado, F, Almeida, N and Vale e Azevedo, A (2020) Aligning financial and functional equivalent depreciations rates of building assets. Engineering, Construction and Architectural Management, 27(02), 441-57.
van Mossel, H-J and Straub, A (2009) The need for customizing maintenance services in social housing. Construction Management and Economics, 27(02), 135–51.
Wang, X, Shi, L, Wang, B and Kan, M (2020) A method to evaluate credit risk for banks under PPP project finance. Engineering, Construction and Architectural Management, 27(02), 483-501.
Warsame, A (2009) Organizational modes in the residential building sector in Sweden. Construction Management and Economics, 27(02), 153–63.
Wei, H, Minggang, H and Qun, H (1999) Quasi-static testing of composite masonry construction. Building Research & Information, 27(02), 120–3.
Yevu, S K and Yu, A T W (2020) The ecosystem of drivers for electronic procurement adoption for construction project procurement. Engineering, Construction and Architectural Management, 27(02), 411–40.
Zarghami, S A and Gunawan, I (2020) A domain-specific measure of centrality for water distribution networks. Engineering, Construction and Architectural Management, 27(02), 341–55.
Zhou, S, Ng, S T, Lee, S H, Xu, F J and Yang, Y (2020) A domain knowledge incorporated text mining approach for capturing user needs on BIM applications. Engineering, Construction and Architectural Management, 27(02), 458-82.
Zohrehvandi, S, Vanhoucke, M, Soltani, R and Javadi, M (2020) A reconfigurable model for implementation in the closing phase of a wind turbines project construction. Engineering, Construction and Architectural Management, 27(02), 502–24.