Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 31 results ...
Abdullah, A K and Alshibani, A (2022) Multi-criteria decision-making framework for selecting sustainable private partners for housing projects. Journal of Financial Management of Property and Construction, 27(01), 112-40.
Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(01), 89–102.
Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(01), 3–23.
Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(01), 53–71.
Burford, N K and Smith, F W (1999) Developing a new military shelter system: a case study in innovation. Building Research & Information, 27(01), 35–55.
Daget, Y T and Zhang, H (2020) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(01), 296–320.
Du, J, Jing, H, Castro-Lacouture, D and Sugumaran, V (2020) Multi-agent simulation for managing design changes in prefabricated construction projects. Engineering, Construction and Architectural Management, 27(01), 270-95.
- Type: Journal Article
- Keywords: decision support systems; risk management; simulation
- ISBN/ISSN: 09699988
- URL: https://doi.org/10.1108/ECAM-11-2018-0524
- Abstract:
Purpose: The purpose of this paper is to develop a multi-agent-based model for quantitatively measuring how the design change management strategies improve project performance. Design/methodology/approach: Based on questionnaires and interviews, this paper investigates the coordination mechanism of risks due to design changes in prefabricated construction (PC) projects. Combined with all the variables related with design change risks, a multi-agent-based simulation model is proposed to evaluate the design change management effect. Findings: The coordination mechanism between design change factors, design change events, risk consequence and management strategy in PC projects is described and then the simulation-based design change management mechanism in PC projects is used to assess the effect of management strategies under dynamic scenarios. Originality/value: PC projects have rapidly increased in recent years due to the advantages of fast construction, high quality and labor savings. Different from traditional on-site construction, the impact and risk from design changes are likely to be greater due to the prefabricated project being multi-stage, highly interactive and complex. The simulations presented in this paper make it possible to test different design change management strategies in order to study their effectiveness and support managerial decision making.
Durdyev, S, Hosseini, M R, Martek, I, Ismail, S and Arashpour, M (2020) Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(01), 186–204.
Ginigaddara, B, Perera, S, Feng, Y and Rahnamayiezekavat, P (2022) An evaluation of offsite construction skill profiles. Journal of Financial Management of Property and Construction, 27(01), 16-28.
Han, J, Rapoport, A and Fong, P S (2020) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(01), 49–65.
Hossain, L (2009) Communications and coordination in construction projects. Construction Management and Economics, 27(01), 25–39.
Hwang, B G, Zhao, X and Lim, J (2020) Job satisfaction of project managers in green construction projects: Influencing factors and improvement strategies. Engineering, Construction and Architectural Management, 27(01), 205-26.
Kumar, A, Srivastava, V, Tabash, M I and Chawda, D (2022) Profitability determinants of infrastructure public private partnerships (PPPs): empirical evidence from Indian data. Journal of Financial Management of Property and Construction, 27(01), 91-111.
Lam, P T I and Wong, F W H (2009) Improving building project performance: how buildability benchmarking can help. Construction Management and Economics, 27(01), 41–52.
Leaman, A and Bordass, B (1999) Productivity in buildings: the 'killer' variables. Building Research & Information, 27(01), 4–19.
Liao, X, Lee, C Y and Chong, H (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(01), 227–44.
Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2020) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(01), 128–49.
Mahamadu, A M, Manu, P, Mahdjoubi, L, Booth, C, Aigbavboa, C and Abanda, F H (2020) The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management, 27(01), 24-48.
Mahmud, A T, Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: a systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(01), 29-56.
Moohialdin, A S M, Lamari, F, Miska, M and Trigunarsyah, B (2020) Construction worker productivity in hot and humid weather conditions. Engineering, Construction and Architectural Management, 27(01), 83–108.
Ojo, A, Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in Ondo State, Nigeria. Journal of Financial Management of Property and Construction, 27(01), 57-75.
Owusu-Manu, D G, Amo-Asamoah, E, Ghansah, F A and Asumadu, G (2022) An analysis of the economic viability of waste-to-energy generation in the Kumasi metropolis of Ghana. Journal of Financial Management of Property and Construction, 27(01), 1-15.
Ozyurt, B, Dikmen, I and Birgonul, M T (2020) Clustering of host countries to facilitate learning between similar international construction markets. Engineering, Construction and Architectural Management, 27(01), 66–82.
Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(01), 20–34.
Sang, L, Xia, D, Ni, G, Cui, Q, Wang, J and Wang, W (2020) Influence mechanism of job satisfaction and positive affect on knowledge sharing among project members: Moderator role of organizational commitment. Engineering, Construction and Architectural Management, 27(01), 245-69.
Sarhan, J G, Xia, B, Fawzia, S, Karim, A, Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(01), 1-23.
Sezer, A A and Bröchner, J (2020) Site managers’ ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management, 27(01), 109–27.
Singla, H K and Samanta, P K (2022) Identification of critical success factors (CSFs) for real estate developers (REDs) in India. Journal of Financial Management of Property and Construction, 27(01), 76-90.
Wang, D, Fu, H and Fang, S (2020) The efficacy of trust for the governance of uncertainty and opportunism in megaprojects: The moderating role of contractual control. Engineering, Construction and Architectural Management, 27(01), 150-67.
Wang, Y, Liu, J, Zuo, J and Rameezdeen, R (2020) Ways to improve the project management efficiency in a centralized public procurement system: A structural equation modeling approach. Engineering, Construction and Architectural Management, 27(01), 168-85.
Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(01), 73–87.