Abdullah, A K and Alshibani, A (2022) Multi-criteria decision-making framework for selecting sustainable private partners for housing projects. Journal of Financial Management of Property and Construction, 27(01), 112-40.

Ahadzie, D K, Proverbs, D G, Olomolaiye, P O and Ankrah, N (2009) Towards developing competency-based measures for project managers in mass house building projects in developing countries. Construction Management and Economics, 27(01), 89–102.

Al-Kharashi, A and Skitmore, M (2009) Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27(01), 3–23.

Bageis, A S and Fortune, C (2009) Factors affecting the bid/no bid decision in the Saudi Arabian construction contractors. Construction Management and Economics, 27(01), 53–71.

Burford, N K and Smith, F W (1999) Developing a new military shelter system: a case study in innovation. Building Research & Information, 27(01), 35–55.

Daget, Y T and Zhang, H (2019) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(01), 296–320.

Daget, Y T and Zhang, H (2020) Decision-making model for the evaluation of industrialized housing systems in Ethiopia. Engineering, Construction and Architectural Management, 27(01), 296-320.

Du, J, Jing, H, Castro-Lacouture, D and Sugumaran, V (2019) Multi-agent simulation for managing design changes in prefabricated construction projects. Engineering, Construction and Architectural Management, 27(01), 270–95.

Du, J, Jing, H, Castro-Lacouture, D and Sugumaran, V (2020) Multi-agent simulation for managing design changes in prefabricated construction projects. Engineering, Construction and Architectural Management, 27(01), 270-95.

Durdyev, S, Hosseini, M R, Martek, I, Ismail, S and Arashpour, M (2019) Barriers to the use of integrated project delivery (IPD): a quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(01), 186–204.

Durdyev, S, Hosseini, M R, Martek, I, Ismail, S and Arashpour, M (2020) Barriers to the use of integrated project delivery (IPD): A quantified model for Malaysia. Engineering, Construction and Architectural Management, 27(01), 186-204.

Ginigaddara, B, Perera, S, Feng, Y and Rahnamayiezekavat, P (2022) An evaluation of offsite construction skill profiles. Journal of Financial Management of Property and Construction, 27(01), 16-28.

Han, J, Rapoport, A and Fong, P S (2019) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(01), 49–65.

Han, J, Rapoport, A and Fong, P S W (2020) Incentive structures in multi-partner project teams. Engineering, Construction and Architectural Management, 27(01), 49-65.

Hossain, L (2009) Communications and coordination in construction projects. Construction Management and Economics, 27(01), 25–39.

Hwang, B G, Zhao, X and Lim, J (2020) Job satisfaction of project managers in green construction projects: Influencing factors and improvement strategies. Engineering, Construction and Architectural Management, 27(01), 205-26.

Hwang, B, Zhao, X and Lim, J (2019) Job satisfaction of project managers in green construction projects. Engineering, Construction and Architectural Management, 27(01), 205–26.

Kumar, A, Srivastava, V, Tabash, M I and Chawda, D (2022) Profitability determinants of infrastructure public private partnerships (PPPs): empirical evidence from Indian data. Journal of Financial Management of Property and Construction, 27(01), 91-111.

Lam, P T I and Wong, F W H (2009) Improving building project performance: how buildability benchmarking can help. Construction Management and Economics, 27(01), 41–52.

Leaman, A and Bordass, B (1999) Productivity in buildings: the 'killer' variables. Building Research & Information, 27(01), 4–19.

Liao, X, Lee, C Y and Chong, H (2019) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(01), 227–44.

Liao, X, Lee, C Y and Chong, H Y (2020) Contractual practices between the consultant and employer in Chinese BIM-enabled construction projects. Engineering, Construction and Architectural Management, 27(01), 227-44.

Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2019) Government compensation and costs of non-competition guarantee for PPP rental retirement villages. Engineering, Construction and Architectural Management, 27(01), 128–49.

Mahamadu, A M, Manu, P, Mahdjoubi, L, Booth, C, Aigbavboa, C and Abanda, F H (2020) The importance of BIM capability assessment: An evaluation of post-selection performance of organisations on construction projects. Engineering, Construction and Architectural Management, 27(01), 24-48.

Mahamadu, A, Manu, P, Mahdjoubi, L, Booth, C, Aigbavboa, C and Abanda, F (2019) The importance of BIM capability assessment. Engineering, Construction and Architectural Management, 27(01), 24–48.

Mahmud, A T, Ogunlana, S O and Hong, W T (2022) Understanding the dynamics of cost overrun triggers in highway infrastructure projects in Nigeria: a systems thinking modelling approach. Journal of Financial Management of Property and Construction, 27(01), 29-56.

  • Type: Journal Article
  • Keywords: causal loop diagram; cost overrun triggers; highway projects; Nigeria; systems thinking
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/JFMPC-07-2020-0051
  • Abstract:
    Purpose: Empirical evidence suggests that many triggers influence poor cost performance in highway projects, whereas previous studies about the cost overrun triggers stem from a positivist standpoint supported by conventional statistical techniques, thus disregarding the sophisticated interactions and overall dynamics of the triggers. This study contends for a paradigm shift in investigating and understanding cost overrun triggers by adopting a holistic perspective through the lens of system thinking. This study aims to contend for a paradigm shift in investigating and understanding cost overrun triggers by adopting a holistic perspective through the lens of system thinking. Design/methodology/approach: Semi-structured interviews with industry stakeholders in Nigeria were conducted buttressed by textual data from literature sources and project documents. Data analysis based on a developed data compatible coding framework and causal relations from textual data sources was used to develop a causal loop diagram depicting the interactions of the triggers which were validated by experts. Findings: The analysis of the causal loop diagrams (CLDs) allowed identification of action points used to suggest changes for improved cost-effective highway project delivery. Among the suggested interventions are ensuring the provision of adequate funding prior to contract award will result in timely delivery of projects and indeed delivering key projects at the contractual agreed budget. This can be achieved through ensuring strict adherence to the provisions of Section 4 (2) (b) of the Nigerian Public Procurement Act, 2007 which stipulates that no contract should be awarded if funds are not available from the onset. Research limitations/implications: The study was limited to only highway infrastructure projects in Nigeria and as such caution must be taken before using the outcome of the study to other context within Nigeria and beyond. Practical implications: From a practical point of view, the causal model demonstrates that this study is capable of being used to make pragmatic decisions regarding policy leverages about improving cost performance in highway projects provision in the Nigerian highway infrastructure sector of the construction industry. Moreover, it will aid a clear understanding of the key influencing triggers of cost overrun by the relevant stakeholders within the highway sector of the industry. Originality/value: The hybrid-based approach applied in the development of CLDs in this study is expected to provide new insight into understanding the linkages, interactions, feedbacks and processes among the key cost overrun triggers and suggesting leverages for cost performance improvement within the philosophy of system thinking. © 2021, Emerald Publishing Limited.

Moohialdin, A S M, Lamari, F, Miska, M and Trigunarsyah, B (2019) Construction worker productivity in hot and humid weather conditions. Engineering, Construction and Architectural Management, 27(01), 83–108.

Ojo, A, Ogunsina, O and Ogunsemi, D R (2022) Assessment of cost management practices of civil engineering (project procurement) organisations in Ondo State, Nigeria. Journal of Financial Management of Property and Construction, 27(01), 57-75.

Owusu-Manu, D G, Amo-Asamoah, E, Ghansah, F A and Asumadu, G (2022) An analysis of the economic viability of waste-to-energy generation in the Kumasi metropolis of Ghana. Journal of Financial Management of Property and Construction, 27(01), 1-15.

Ozyurt, B, Dikmen, I and Birgonul, M T (2019) Clustering of host countries to facilitate learning between similar international construction markets. Engineering, Construction and Architectural Management, 27(01), 66–82.

Ozyurt, B, Dikmen, I and Birgonul, M T (2020) Clustering of host countries to facilitate learning between similar international construction markets. Engineering, Construction and Architectural Management, 27(01), 66-82.

Papamichael, K (1999) Application of information technologies in building design decisions. Building Research & Information, 27(01), 20–34.

Sang, L, Xia, D, Ni, G, Cui, Q, Wang, J and Wang, W (2019) Influence mechanism of job satisfaction and positive affect on knowledge sharing among project members. Engineering, Construction and Architectural Management, 27(01), 245–69.

Sang, L, Xia, D, Ni, G, Cui, Q, Wang, J and Wang, W (2020) Influence mechanism of job satisfaction and positive affect on knowledge sharing among project members: Moderator role of organizational commitment. Engineering, Construction and Architectural Management, 27(01), 245-69.

Sarhan, J G, Xia, B, Fawzia, S, Karim, A, Olanipekun, A O and Coffey, V (2019) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique. Engineering, Construction and Architectural Management, 27(01), 1–23.

Sarhan, J G, Xia, B, Fawzia, S, Karim, A, Olanipekun, A O and Coffey, V (2020) Framework for the implementation of lean construction strategies using the interpretive structural modelling (ISM) technique: A case of the Saudi construction industry. Engineering, Construction and Architectural Management, 27(01), 1-23.

Sezer, A A and Bröchner, J (2020) Site managers' ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management, 27(01), 109-27.

Sezer, A A and Bröchner, J (2019) Site managers’ ICT tools for monitoring resources in refurbishment. Engineering, Construction and Architectural Management, 27(01), 109–27.

Singla, H K and Samanta, P K (2022) Identification of critical success factors (CSFs) for real estate developers (REDs) in India. Journal of Financial Management of Property and Construction, 27(01), 76-90.

Wang, D, Fu, H and Fang, S (2019) The efficacy of trust for the governance of uncertainty and opportunism in megaprojects. Engineering, Construction and Architectural Management, 27(01), 150–67.

Wang, D, Fu, H and Fang, S (2020) The efficacy of trust for the governance of uncertainty and opportunism in megaprojects: The moderating role of contractual control. Engineering, Construction and Architectural Management, 27(01), 150-67.

Wang, Y, Liu, J, Zuo, J and Rameezdeen, R (2019) Ways to improve the project management efficiency in a centralized public procurement system. Engineering, Construction and Architectural Management, 27(01), 168–85.

Wang, Y, Liu, J, Zuo, J and Rameezdeen, R (2020) Ways to improve the project management efficiency in a centralized public procurement system: A structural equation modeling approach. Engineering, Construction and Architectural Management, 27(01), 168-85.

Yun, S and Caldas, C H (2009) Analysing decision variables that influence preliminary feasibility studies using data mining techniques. Construction Management and Economics, 27(01), 73–87.