Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 29 results ...

Ansah, R H and Sorooshian, S (2018) 4P delays in project management. Engineering, Construction and Architectural Management, 25(01), 62-76.

Babatunde, S O, Perera, S, Ekundayo, D and Adeleye, T E (2019) An investigation into BIM-based detailed cost estimating and drivers to the adoption of BIM in quantity surveying practices. Journal of Financial Management of Property and Construction , 25(01), 61–81.

Carreira, P, Castelo, T, Gomes, C C, Ferreira, A, Ribeiro, C and Costa, A A (2018) Virtual reality as integration environments for facilities management: Application and users' perceptions. Engineering, Construction and Architectural Management, 25(01), 90-112.

Cheah, C Y J, Kang, J and Chew, D A S (2007) Strategic analysis of large local construction firms in China. Construction Management and Economics, 25(01), 25-38.

Chen, J J (1997) China's construction industry and foreign investment. Building Research & Information, 25(01), 5–10.

Coleman, E, Nooni, I K, Fianko, S K, Dadzie, L, Neequaye, E N, Owusu-Agyemang, J and Ansa-Asare, E O (2020) Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry. Journal of Financial Management of Property and Construction, 25(01), 41–60.

  • Type: Journal Article
  • Keywords: Bid for public work; Building contractors; Building evaluation; Building/construction economics; Contract management; Higher education; Construction industry; Government of Ghana;
  • ISBN/ISSN: 1366-4387
  • URL: https://doi.org/10.1108/JFMPC-08-2018-0046
  • Abstract:
    This study aims to investigate the attainment of quality in Government of Ghana’s (GoG) infrastructural projects through effective contract management and especially, relating to qualification, competence and experience of supply chain stakeholders.

    Design/methodology/approach

    A survey questionnaire and field observations were used to collect primary data from staff of the education ministry and construction professionals. Documentary analyses of contract documents were also undertaken.

    Findings

    The results show that executing agencies’ failure to apply appropriate contract management processes was linked to the gap between stakeholders’ knowledge and actual practice. This was confirmed by Spearman’s rho tests of correlation between overall mean ranks given by professionals and non-professionals, which indicated strong agreement between those groups. Factors such as contractors’ engagement of unqualified supervisory staff, lack of proper projects monitoring and evaluation by executing agencies mainly contribute to the poor quality of work.

    Research limitations/implications

    Investigations were limited to the Funds and Procurement Management Unit of the Ministry of Education, Metropolitan, Municipal and District Assemblies and local contractors. Nonetheless, the methodology used could be used in future studies to analyse the socio-economic implications on the quality of education infrastructure.

    Practical implications

    Construction is booming in Ghana but the capacity to improve the work quality through effective contract management is limited. However, with the effort of stakeholder and statutory bodies’ support in capacity building initiatives, GoG projects could offer some novel solutions to improve quality of work.

    Social implications

    Construction industry professionals and students’ knowledge and perception on construction industry and contract management is significantly improved.

    Originality/value

    This study provides information on respondents’ knowledge on contract management process, which, if not properly understood, can lead to poor quality of work and loss of money.

Fan, Y and Kokko, E (1997) Three-dimensional gaseous transfer within cellular plastic insulation and its consequences. Building Research & Information, 25(01), 25–35.

Gerbov, A, Singh, V and Herva, M (2018) Challenges in applying design research studies to assess benefits of BIM in infrastructure projects: Reflections from Finnish case studies. Engineering, Construction and Architectural Management, 25(01), 2-20.

Hatamleh, M T, Hiyassat, M, Sweis, G J and Sweis, R J (2018) Factors affecting the accuracy of cost estimate: Case of Jordan. Engineering, Construction and Architectural Management, 25(01), 113-31.

Ikuabe, M, Oke, A E and Aigbavboa, C (2020) Impact of contractors’ opportunism on construction project transaction costs. Journal of Financial Management of Property and Construction , 25(01), 125–41.

Keswani, K (1997) The contribution of building centres to low-cost housing in India. Building Research & Information, 25(01), 50–64.

Lewis, T M (2007) Impact of globalization on the construction sector in developing countries. Construction Management and Economics, 25(01), 7-23.

Lian, J K M, Foo, Z Y and Ling, F Y Y (2018) Value of internships for professional careers in the built environment sector in Singapore. Engineering, Construction and Architectural Management, 25(01), 77-89.

Lingard, H, Blismas, N, Harley, J, Stranieri, A, Zhang, R P and Pirzadeh, P (2018) Making the invisible visible: Stimulating work health and safety-relevant thinking through the use of infographics in construction design. Engineering, Construction and Architectural Management, 25(01), 39-61.

Ma, L, Reed, R and Jin, X (2018) Identify the equilibrium of residential construction output: A vector error correction model approach. Engineering, Construction and Architectural Management, 25(01), 21-38.

Mbachu, J and Nkado, R (2007) Factors constraining successful building project implementation in South Africa. Construction Management and Economics, 25(01), 39-54.

Perera, B, Samarakkody, A L and Nandasena, S R (2020) Managing financial and economic risks associated with high-rise apartment building construction in Sri Lanka. Journal of Financial Management of Property and Construction , 25(01), 143–62.

Pheng, L S and Omar, H F (1997) Integration, segmentalism and the maintenance of quality management systems in the construction industry. Building Research & Information, 25(01), 36–49.

Plessis, C D (2007) A strategic framework for sustainable construction in developing countries. Construction Management and Economics, 25(01), 67-76.

Rwelamila, P M D (2007) Project management competence in public sector infrastructure organisations. Construction Management and Economics, 25(01), 55-66.

Sha, K, Deng, X, Chen, Q and Xie, B (1997) Evolution of cost estimating system in China: intelligent estimator for Shandong Province (IES) to general intelligent estimator (GIE). Building Research & Information, 25(01), 11–4.

Shih, N-J and Lan, W-J (1997) Incorporating a 3D urban environmental model (3DUEM) into government and architectural firms. Building Research & Information, 25(01), 18–24.

Singla, H K (2020) Does family ownership affect the profitability of construction and real estate firms? Evidence from India. Journal of Financial Management of Property and Construction , 25(01), 107–24.

Tawalare, A and Laishram, B (2019) Factors hindering effective partnering in Indian public sector construction organizations. Journal of Financial Management of Property and Construction , 25(01), 83–105.

Wei, H and Xu, X (1997) Composite masonry buildings in China. Building Research & Information, 25(01), 15–7.

Wells, J (2007) Informality in the construction sector in developing countries. Construction Management and Economics, 25(01), 87-93.

Wong, J, Wong, P N K and Heng, L (2007) An investigation of leadership styles and relationship cultures of Chinese and expatriate managers in multinational construction companies in Hong Kong. Construction Management and Economics, 25(01), 95-106.

Yorucu, V and Keles, R (2007) The construction boom and environmental protection in Northern Cyprus as a consequence of the Annan Plan. Construction Management and Economics, 25(01), 77-86.

Zekri, M M and Razali, M N (2019) Volatility dynamics of Malaysian listed property companies within the Asian public property markets by using a switching regime approach. Journal of Financial Management of Property and Construction , 25(01), 5–39.