Abu El-Maaty, A E, El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(05), 809-27.
Adaku, E, Osei-Poku, V, Ottou, J A and Yirenkyi-Fianko, A (2024) Contractor payment delays: a systematic review of current trends and future directions. Construction Innovation, 24(05), 1205–27.
Agyekum-Mensah, G and Knight, A D (2017) The professionals’ perspective on the causes of project delay in the construction industry. Engineering, Construction and Architectural Management, 24(05), 828-41.
Ahmed, S and El-Sayegh, S (2024) Relevant criteria for selecting project delivery methods in sustainable construction. International Journal of Construction Management, 24(05), 512–20.
Almasabha, G, Shehadeh, A, Alshboul, O and Al Hattamleh, O (2024) Structural performance of buried reinforced concrete pipelines under deep embankment soil. Construction Innovation, 24(05), 1280-96.
Aloyce, D, Monko, R J and Luvara, V G M (2024) Critical audit indicators for assessing construction projects performance (cpp) at pre-contract stage in Tanzania. International Journal of Construction Management, 24(05), 530–9.
Bamgbade, J A, Hosany, M M, Ajibike, W A and Chai, C S (2024) Green supply chain nuances in East Malaysian construction industry. International Journal of Construction Management, 24(05), 477–85.
Bijivemula, S K R, Sai, S J and Chepuri, A (2024) A structural equation model of stakeholder roles in the implementation of green construction strategies in the Indian construction industry. International Journal of Construction Management, 24(05), 486–94.
Boussabaine, A H and Duff, A R (1996) An expert-simulation system for construction productivity forecasting. Building Research & Information, 24(05), 279–86.
Caven, V (2006) Career building: women and non-standard employment in architecture. Construction Management and Economics, 24(05), 457-64.
Chan, A P C and Oppong, G D (2017) Managing the expectations of external stakeholders in construction projects. Engineering, Construction and Architectural Management, 24(05), 736-56.
Chang, R-D, Zuo, J, Soebarto, V, Zhao, Z-Y and Zillante, G (2017) Dynamic interactions between sustainability and competitiveness in construction firms: A transition perspective. Engineering, Construction and Architectural Management, 24(05), 842-59.
Cheah, C Y J and Liu, J (2006) Valuing governmental support in infrastructure projects as real options using Monte Carlo simulation. Construction Management and Economics, 24(05), 545-54.
Chen, J J and Wills, D (1996) Urban housing reform in China: policies and performance. Building Research & Information, 24(05), 311–7.
Denny-Smith, G and Loosemore, M (2017) Integrating indigenous enterprises into the Australian construction industry. Engineering, Construction and Architectural Management, 24(05), 788-808.
Dinh, T H, Dinh, T H and Götze, U (2024) Roadworks design: Study on selection of construction materials in the preliminary design phase based on economic performance. International Journal of Construction Management, 24(05), 503–11.
Edwards, D J, Shaw, A and Holt, G D (1996) Electronic document management systems and the management of UK construction projects. Building Research & Information, 24(05), 287–92.
Elkholosy, H, Ead, R, Hammad, A and AbouRizk, S (2024) Data mining for forecasting labor resource requirements: A case study of project management staffing requirements. International Journal of Construction Management, 24(05), 561–72.
Friedman, A and Cammalleri, V (1996) Advanced wood frame construction details in Canada. Building Research & Information, 24(05), 270–8.
Hassanein, A A G and Melin, J W (1996) Time constraints set by prime contractors for their sub-contractors. Building Research & Information, 24(05), 293–301.
Hilu, K A and Hiyassat, M A (2024) Qualitative assessment of resilience in construction projects. Construction Innovation, 24(05), 1297-319.
Ilyas, M, Shaojun, C, Li, Y, Ahmad, S and Hamza, A (2024) Cause analysis of delay in development induced displacement and resettlement (didr) project. A case study of diamer basha dam project in Pakistan. International Journal of Construction Management, 24(05), 551–60.
Jayamaha, B H V H, Perera, B A K S, Gimhani, K D M and Rodrigo, M N N (2024) Adaptability of enterprise resource planning (ERP) systems for cost management of building construction projects in Sri Lanka. Construction Innovation, 24(05), 1255-79.
Kale, S and Arditi, D (2006) Diffusion of ISO 9000 certification in the precast concrete industry. Construction Management and Economics, 24(05), 485-95.
Kaming, P F, Olomolaiye, P O, Holt, G D, Kometa, S T and Harris, F C (1996) Project managers' perception of production problems - an Indonesian case study. Building Research & Information, 24(05), 302–10.
Kedir, F, Hall, D M, Brantvall, S, Lessing, J, Hollberg, A and Soman, R K (2024) Circular information flows in industrialized housing construction: the case of a multi-family housing product platform in Sweden. Construction Innovation, 24(05), 1354-79.
Khanapure, V and Shastri, S (2024) A sustainability assessment framework for high-rise residential projects: A case of India. International Journal of Construction Management, 24(05), 495–502.
Kineber, A F, Othman, I, Oke, A E, Chileshe, N and Zayed, T (2024) Modeling the relationship between value management implementation phases, critical success factors and overall project success. Construction Innovation, 24(05), 1380-400.
Liu, A M M and Fang, Z (2006) A power-based leadership approach to project management. Construction Management and Economics, 24(05), 497-507.
Moore, D (1996) The Renaissance: the beginning of the end for implicit buildability. Building Research & Information, 24(05), 259–69.
Murphy, M E and Nahod, M-M (2017) Stakeholder competency in evaluating the environmental impacts of infrastructure projects using BIM. Engineering, Construction and Architectural Management, 24(05), 718-35.
Nguyen Ngoc, H, Mohammed Abdelkader, E, Al-Sakkaf, A, Alfalah, G and Zayed, T (2024) A hybrid AHP-maut model for assessing competitiveness of construction companies: A case study of construction companies in Vietnam and Canada. Construction Innovation, 24(05), 1320-53.
Oke, A E, Aliu, J, Jamir Singh, P S, Onajite, S A, Shaharudin Samsurijan, M and Azura Ramli, R (2024) Appraisal of awareness and usage of digital technologies for sustainable wellbeing among construction workers in a developing economy. International Journal of Construction Management, 24(05), 521–9.
Ramsaran, R and Hosein, R (2006) Growth, employment and the construction industry in Trinidad and Tobago. Construction Management and Economics, 24(05), 465-74.
Sammour, F, Alkailani, H, Sweis, G J, Sweis, R J, Maaitah, W and Alashkar, A (2024) Forecasting demand in the residential construction industry using machine learning algorithms in Jordan. Construction Innovation, 24(05), 1228-54.
Shang, G, Pheng, L S and Zhong Xia, R L (2024) Adoption of smart contracts in the construction industry: an institutional analysis of drivers and barriers. Construction Innovation, 24(05), 1401-21.
Sinesilassie, E G, Tabish, S Z S and Jha, K N (2017) Critical factors affecting schedule performance: A case of Ethiopian public construction projects: engineers’ perspective. Engineering, Construction and Architectural Management, 24(05), 757-73.
- Type: Journal Article
- Keywords: factor analysis; ethiopia; critical factors; project success; public projects; schedule performance
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-03-2016-0062
- Abstract:
The paper determines the factors for performance of Ethiopian public construction projects revealing that conflict among project participants, poor human resource management and project manager's ignorance and lack of knowledge are detrimental for the projects' performance.
Styhre, A and Josephson, P-E (2006) Revisiting site manager work: stuck in the middle?. Construction Management and Economics, 24(05), 521-8.
Tran, D Q, Molenaar, K R and Kolli, B (2017) Implementation of best-value procurement for highway design and construction in the USA. Engineering, Construction and Architectural Management, 24(05), 774-87.
Wang, D, Hadavi, A and Krizek, R J (2006) Chinese construction firms in reform. Construction Management and Economics, 24(05), 509-19.
Yiu, C Y and Tam, C S (2006) Rational under-pricing in bidding strategy: a real options model. Construction Management and Economics, 24(05), 475-84.
Zabidin, N S, Belayutham, S and Che Ibrahim, C K I (2024) The knowledge, attitude and practices (kap) of industry 4.0 between construction practitioners and academicians in Malaysia: A comparative study. Construction Innovation, 24(05), 1185-204.
Zhang, G and Yang, J (2006) Factors influencing the implementation of the raised floor system in Australian office buildings. Construction Management and Economics, 24(05), 529-43.
Zhao, X (2024) Construction risk management research: Intellectual structure and emerging themes. International Journal of Construction Management, 24(05), 540–50.