Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 39 results ...

Abdeen, F N, Gunatilaka, R N, Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(04), 892-911.

Ahmadian, F F A, Rashidi, T H, Akbarnezhad, A and Waller, S T (2017) BIM-enabled sustainability assessment of material supply decisions. Engineering, Construction and Architectural Management, 24(04), 668-95.

Al-Hammad, A M, Al-Mubaiyadh, S and Mahmoud, T (1996) Public versus private sector's assessment of problems facing the building maintenance industry in Saudi Arabia. Building Research & Information, 24(04), 245–54.

Bajpai, A and Misra, S C (2024) Evaluation of success factors to implement digitalization in the construction industry. Construction Innovation, 24(04), 865-91.

Best, R and Langston, C (2006) Evaluation of construction contractor performance: a critical analysis of some recent research. Construction Management and Economics, 24(04), 439-45.

Buijs, A and Silvester, S (1996) Demonstration projects and sustainable housing. Building Research & Information, 24(04), 195–202.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(04), 391-405.

Daniel, E I, Oshodi, O, Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: exploration of the influencing factors and the way forward. Construction Innovation, 24(04), 965-85.

Do, S T, Nguyen, V T and Banlasan, D (2024) Social media sensing framework for urban infrastructure management: a Philippine case study. Construction Innovation, 24(04), 1117-36.

Ejohwomu, O A, Oshodi, O S and Lam, K C (2017) Nigeria’s construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(04), 652-67.

Ekanayake, B, Ahmadian Fard Fini, A, Wong, J K W and Smith, P (2024) A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Construction Innovation, 24(04), 933-49.

Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(04), 222–7.

GhaffarianHoseini, A, Tien, D D, Naismith, N, Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (green star). Engineering, Construction and Architectural Management, 24(04), 696-714.

Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(04), 1048-65.

Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(04), 213–22.

Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(04), 228–36.

Hassanein, A A G and Hakam, Z H R (1996) A bidding decision index for construction contractors. Building Research & Information, 24(04), 237–44.

Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(04), 575-92.

Huang, Y-L and Chou, S-P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(04), 379-89.

Johnson, C, Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(04), 367-78.

Kazemi, R M, Riley, D, Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(04), 610-28.

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(04), 203–8.

Malla, V (2024) Structuration of lean-agile integrated factors for construction projects. Construction Innovation, 24(04), 986-1004.

Oke, A E, Aliu, J, Onajite, S and Simeon, M (2024) Success factors of digital technologies (DT) tools adoption for sustainable construction in a developing economy. Construction Innovation, 24(04), 950-64.

Oke, A E, Aliu, J, Tunji-Olayeni, P and Abayomi, T (2024) Application of gamification for sustainable construction: an evaluation of the challenges. Construction Innovation, 24(04), 1066-84.

Olugboyega, O, Ilesanmi, K E, Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: perspectives from digital competence model. Construction Innovation, 24(04), 912-32.

Panahi, B, Moezzi, E, Preece, C N and Wan, Z W N (2017) Value conflicts and organizational commitment of internal construction stakeholders. Engineering, Construction and Architectural Management, 24(04), 554-74.

Parchami, J M and Shoar, S (2017) A hybrid SD-dematel approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(04), 629-51.

Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.

Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(04), 1005-25.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: a case study. Construction Management and Economics, 24(04), 339-48.

Tang, C M, Wong, C W Y, Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Construction Management and Economics, 24(04), 349-65.

Thomas, A V, Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(04), 407-24.

Uzun, C and Cangür, R E (2024) An ontological assessment proposal for architectural outputs of generative adversarial network. Construction Innovation, 24(04), 1165-84.

Wang, K, Guo, F, Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: a bibliometric literature review and a case study from China. Construction Innovation, 24(04), 1085-116.

Wilson, J G and Gupta, N K (1996) Assessment of structure formation in fresh concrete by measurement of its electrical resistance. Building Research & Information, 24(04), 209–12.

Wong, J T Y and Hui, E C M (2006) Construction project risks: further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(04), 425-38.

Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(04), 1026-47.

Zoleykani, M J, Abbasianjahromi, H, Banihashemi, S, Tabadkani, S A and Hajirasouli, A (2024) Extended reality (XR) technologies in the construction safety: systematic review and analysis. Construction Innovation, 24(04), 1137-64.

  • Type: Journal Article
  • Keywords: augmented reality; construction industry; extended reality; mixed reality; safety; virtual reality
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-05-2022-0131
  • Abstract:
    Purpose: Extended reality (XR) is an emerging technology, with its popularity rising in different industry sectors, where its application has been recently considered in construction safety. This study aims to investigate the applications of XR technologies in the safety of construction through projects lifecycle perspective. Design/methodology/approach: Scientometric analysis was conducted to discover trends, keywords, contribution of countries and publication outlets in the literature. The content analysis was applied to categorize previous studies into three groups concerning the phase of lifecycle in which they used XR. Findings: Results of the content analysis showed that the application of XR in the construction safety is mostly covered in two areas, namely, safety training and risk management. It was found that virtual reality was the most used XR tool with most of its application dedicated to safety training in the design phase. The amount of research on the application of augmented reality and mixed reality in safety training, and risk management in all phases of lifecycle is still insignificant. Finally, this study proposed three main areas for using the XR technologies regarding the safety issues in future research, namely, control of safety regulations and safety coordination in construction phase, and safety reports in the operation phase. Originality/value: This paper inspected the utilization of all types of XR for safety in each phase of construction lifecycle and proposed future directions for research by addressing the safety challenges in each phase. © 2023, Emerald Publishing Limited.