Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 39 results ...

Abdeen, F N, Gunatilaka, R N, Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(04), 892-911.

Ahmadian, F F A, Rashidi, T H, Akbarnezhad, A and Waller, S T (2017) BIM-enabled sustainability assessment of material supply decisions. Engineering, Construction and Architectural Management, 24(04), 668-95.

Al-Hammad, A M, Al-Mubaiyadh, S and Mahmoud, T (1996) Public versus private sector's assessment of problems facing the building maintenance industry in Saudi Arabia. Building Research & Information, 24(04), 245–54.

Bajpai, A and Misra, S C (2024) Evaluation of success factors to implement digitalization in the construction industry. Construction Innovation, 24(04), 865-91.

  • Type: Journal Article
  • Keywords: digitalization in construction; fuzzy DEMATEL; generalized study; mmde algorithm; success factors
  • ISBN/ISSN:
  • URL: https://doi.org/10.1108/CI-02-2022-0042
  • Abstract:
    Purpose: This study aims to identify and rank the key success factors linked with digitalization in the Indian construction sector. Because the construction firms in India are in the early stages of implementing digitalization in their operations, it provides a framework from which they may focus on the effectiveness of digitalization. Design/methodology/approach: This research study examines 12 success factors related to digitalization in construction, which are derived from various sectors. Furthermore, experts from the construction industry and academia have validated these factors with respect to the Indian construction sector. The multi-criteria decision-making techniques are further used to examine the interrelationship, ranking and weightage of digitalization success. Finally, the success factors are validated through a questionnaire-based empirical study followed by ranking using a t-test. The results from both approaches (company-specific and generalized) are compared and discussed. Findings: This research identifies that selecting appropriate digital methods and techniques is a critical success factor as far as digitalization in the Indian construction scenario is concerned. Besides that, continuous monitoring and control in digital implementation significantly impact other factors. Research limitations/implications: While similar results are obtained from approaches adopted in the study, a few success factors appear to differ in terms of their ranking position. Further studies can explore the finer details that can explain the behavior pattern. This study can also be extended by assessing the structural relationship among the identified factors that can throw more light on the dynamics of the continuation of digitalization in construction which can further help in formulating policies or digitalization rollout. Practical implications: The outcome of this study sheds light on construction business knowledge by stressing key success elements connected to digitalization in construction processes in the Indian construction sector. Moreover, this study shows that the success of digitalization in construction is similar to that of transformation in the information technology industry, where adopting suitable digital methods and techniques plays a vital role in the transformation process. Originality/value: Despite the multiple benefits of construction digitalization, limited research focuses on digitalization success factors, making this study unique. Furthermore, this study demonstrates that integrating Fuzzy decision-making trial and evaluation laboratory and maximum mean de-entropy approaches may be used to successfully prioritize success factors in the nascent stage of construction digitalization. © 2022, Emerald Publishing Limited.

Best, R and Langston, C (2006) Evaluation of construction contractor performance: a critical analysis of some recent research. Construction Management and Economics, 24(04), 439-45.

Buijs, A and Silvester, S (1996) Demonstration projects and sustainable housing. Building Research & Information, 24(04), 195–202.

Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(04), 391-405.

Daniel, E I, Oshodi, O, Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: exploration of the influencing factors and the way forward. Construction Innovation, 24(04), 965-85.

Do, S T, Nguyen, V T and Banlasan, D (2024) Social media sensing framework for urban infrastructure management: a Philippine case study. Construction Innovation, 24(04), 1117-36.

Ejohwomu, O A, Oshodi, O S and Lam, K C (2017) Nigeria’s construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(04), 652-67.

Ekanayake, B, Ahmadian Fard Fini, A, Wong, J K W and Smith, P (2024) A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Construction Innovation, 24(04), 933-49.

Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(04), 222–7.

GhaffarianHoseini, A, Tien, D D, Naismith, N, Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (green star). Engineering, Construction and Architectural Management, 24(04), 696-714.

Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(04), 1048-65.

Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(04), 213–22.

Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(04), 228–36.

Hassanein, A A G and Hakam, Z H R (1996) A bidding decision index for construction contractors. Building Research & Information, 24(04), 237–44.

Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(04), 575-92.

Huang, Y-L and Chou, S-P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(04), 379-89.

Johnson, C, Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(04), 367-78.

Kazemi, R M, Riley, D, Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(04), 610-28.

Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(04), 203–8.

Malla, V (2024) Structuration of lean-agile integrated factors for construction projects. Construction Innovation, 24(04), 986-1004.

Oke, A E, Aliu, J, Onajite, S and Simeon, M (2024) Success factors of digital technologies (DT) tools adoption for sustainable construction in a developing economy. Construction Innovation, 24(04), 950-64.

Oke, A E, Aliu, J, Tunji-Olayeni, P and Abayomi, T (2024) Application of gamification for sustainable construction: an evaluation of the challenges. Construction Innovation, 24(04), 1066-84.

Olugboyega, O, Ilesanmi, K E, Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: perspectives from digital competence model. Construction Innovation, 24(04), 912-32.

Panahi, B, Moezzi, E, Preece, C N and Wan, Z W N (2017) Value conflicts and organizational commitment of internal construction stakeholders. Engineering, Construction and Architectural Management, 24(04), 554-74.

Parchami, J M and Shoar, S (2017) A hybrid SD-dematel approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(04), 629-51.

Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.

Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(04), 1005-25.

Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: a case study. Construction Management and Economics, 24(04), 339-48.

Tang, C M, Wong, C W Y, Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Construction Management and Economics, 24(04), 349-65.

Thomas, A V, Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(04), 407-24.

Uzun, C and Cangür, R E (2024) An ontological assessment proposal for architectural outputs of generative adversarial network. Construction Innovation, 24(04), 1165-84.

Wang, K, Guo, F, Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: a bibliometric literature review and a case study from China. Construction Innovation, 24(04), 1085-116.

Wilson, J G and Gupta, N K (1996) Assessment of structure formation in fresh concrete by measurement of its electrical resistance. Building Research & Information, 24(04), 209–12.

Wong, J T Y and Hui, E C M (2006) Construction project risks: further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(04), 425-38.

Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(04), 1026-47.

Zoleykani, M J, Abbasianjahromi, H, Banihashemi, S, Tabadkani, S A and Hajirasouli, A (2024) Extended reality (XR) technologies in the construction safety: systematic review and analysis. Construction Innovation, 24(04), 1137-64.