Abstracts – Browse Results
Click on the titles below to expand the information about each abstract.
Viewing 39 results ...
Abdeen, F N, Gunatilaka, R N, Sepasgozar, S M E and Edwards, D J (2024) The usability of a novel mobile augmented reality application for excavation process considering safety and productivity in construction. Construction Innovation, 24(04), 892-911.
Ahmadian, F F A, Rashidi, T H, Akbarnezhad, A and Waller, S T (2017) BIM-enabled sustainability assessment of material supply decisions. Engineering, Construction and Architectural Management, 24(04), 668-95.
Al-Hammad, A M, Al-Mubaiyadh, S and Mahmoud, T (1996) Public versus private sector's assessment of problems facing the building maintenance industry in Saudi Arabia. Building Research & Information, 24(04), 245–54.
Bajpai, A and Misra, S C (2024) Evaluation of success factors to implement digitalization in the construction industry. Construction Innovation, 24(04), 865-91.
Best, R and Langston, C (2006) Evaluation of construction contractor performance: a critical analysis of some recent research. Construction Management and Economics, 24(04), 439-45.
Buijs, A and Silvester, S (1996) Demonstration projects and sustainable housing. Building Research & Information, 24(04), 195–202.
Cheung, F K T and Skitmore, M (2006) A modified storey enclosure model. Construction Management and Economics, 24(04), 391-405.
Daniel, E I, Oshodi, O, Dabara, D and Dimka, N (2024) Towards closing the housing gap in the UK: exploration of the influencing factors and the way forward. Construction Innovation, 24(04), 965-85.
Do, S T, Nguyen, V T and Banlasan, D (2024) Social media sensing framework for urban infrastructure management: a Philippine case study. Construction Innovation, 24(04), 1117-36.
Ejohwomu, O A, Oshodi, O S and Lam, K C (2017) Nigeria’s construction industry: Barriers to effective communication. Engineering, Construction and Architectural Management, 24(04), 652-67.
Ekanayake, B, Ahmadian Fard Fini, A, Wong, J K W and Smith, P (2024) A deep learning-based approach to facilitate the as-built state recognition of indoor construction works. Construction Innovation, 24(04), 933-49.
Enshassi, A (1996) Training for Palestinian engineers to face the challenges of multinational enterprises in the Gaza Strip. Building Research & Information, 24(04), 222–7.
GhaffarianHoseini, A, Tien, D D, Naismith, N, Tookey, J and GhaffarianHoseini, A (2017) Amplifying the practicality of contemporary building information modelling implementations for New Zealand green building certification (green star). Engineering, Construction and Architectural Management, 24(04), 696-714.
Golabchi, H and Hammad, A (2024) Estimating labor resource requirements in construction projects using machine learning. Construction Innovation, 24(04), 1048-65.
Gunning, J G and Cooke, E (1996) The influence of occupational stress on construction professionals. Building Research & Information, 24(04), 213–22.
Hassanein, A A G (1996) Factors affecting the bidding behaviour of contractors in Egypt. Building Research & Information, 24(04), 228–36.
Hassanein, A A G and Hakam, Z H R (1996) A bidding decision index for construction contractors. Building Research & Information, 24(04), 237–44.
Hu, X and Liu, C (2017) Total factor productivity measurement with carbon reduction. Engineering, Construction and Architectural Management, 24(04), 575-92.
- Type: Journal Article
- Keywords: Australia; data analysis; productivity rate; construction industry; carbon reduction; malmquist-luenberger index
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-06-2015-0097
- Abstract:
This paper suggests that total factor productivity (TFP) measurement should consider carbon reduction, which is beneficial for policymakers to promote sustainable productivity development in Australian construction industry.
Huang, Y-L and Chou, S-P (2006) Valuation of the minimum revenue guarantee and the option to abandon in BOT infrastructure projects. Construction Management and Economics, 24(04), 379-89.
Johnson, C, Lizarralde, G and Davidson, C H (2006) A systems view of temporary housing projects in post-disaster reconstruction. Construction Management and Economics, 24(04), 367-78.
Kazemi, R M, Riley, D, Asadi, S and Delgoshaei, P (2017) Improving the performance profile of energy conservation measures at the Penn State University Park campus. Engineering, Construction and Architectural Management, 24(04), 610-28.
Kindangen, J I (1996) Artificial neural networks and naturally ventilated buildings. Building Research & Information, 24(04), 203–8.
Malla, V (2024) Structuration of lean-agile integrated factors for construction projects. Construction Innovation, 24(04), 986-1004.
Oke, A E, Aliu, J, Onajite, S and Simeon, M (2024) Success factors of digital technologies (DT) tools adoption for sustainable construction in a developing economy. Construction Innovation, 24(04), 950-64.
Oke, A E, Aliu, J, Tunji-Olayeni, P and Abayomi, T (2024) Application of gamification for sustainable construction: an evaluation of the challenges. Construction Innovation, 24(04), 1066-84.
Olugboyega, O, Ilesanmi, K E, Oseghale, G E and Aigbavboa, C (2024) The link between construction apps’ acceptance and digital attributes of construction professionals: perspectives from digital competence model. Construction Innovation, 24(04), 912-32.
Panahi, B, Moezzi, E, Preece, C N and Wan, Z W N (2017) Value conflicts and organizational commitment of internal construction stakeholders. Engineering, Construction and Architectural Management, 24(04), 554-74.
Parchami, J M and Shoar, S (2017) A hybrid SD-dematel approach to develop a delay model for construction projects. Engineering, Construction and Architectural Management, 24(04), 629-51.
Rahmani, F, Maqsood, T and Khalfan, M (2017) An overview of construction procurement methods in Australia. Engineering, Construction and Architectural Management, 24(04), 593-609.
Silveira, B F and Costa, D B (2024) Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System. Construction Innovation, 24(04), 1005-25.
Stewart, R A and Spencer, C A (2006) Six-sigma as a strategy for process improvement on construction projects: a case study. Construction Management and Economics, 24(04), 339-48.
Tang, C M, Wong, C W Y, Leung, A Y T and Lam, K C (2006) Selection of funding schemes by a borrowing decision model: a Hong Kong case study. Construction Management and Economics, 24(04), 349-65.
Thomas, A V, Kalidindi, S N and Ganesh, L S (2006) Modelling and assessment of critical risks in BOT road projects. Construction Management and Economics, 24(04), 407-24.
Uzun, C and Cangür, R E (2024) An ontological assessment proposal for architectural outputs of generative adversarial network. Construction Innovation, 24(04), 1165-84.
Wang, K, Guo, F, Zhou, R and Qian, L (2024) Implementation of augmented reality in BIM-enabled construction projects: a bibliometric literature review and a case study from China. Construction Innovation, 24(04), 1085-116.
Wilson, J G and Gupta, N K (1996) Assessment of structure formation in fresh concrete by measurement of its electrical resistance. Building Research & Information, 24(04), 209–12.
Wong, J T Y and Hui, E C M (2006) Construction project risks: further considerations for constructors' pricing in Hong Kong. Construction Management and Economics, 24(04), 425-38.
Wuni, I Y and Mazher, K M (2024) Ending the suitability quantification dilemma: intelligent decision support system for modular integrated construction in a high-density metropolis. Construction Innovation, 24(04), 1026-47.
Zoleykani, M J, Abbasianjahromi, H, Banihashemi, S, Tabadkani, S A and Hajirasouli, A (2024) Extended reality (XR) technologies in the construction safety: systematic review and analysis. Construction Innovation, 24(04), 1137-64.