Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 59 results ...

Adams, F K (2006) Expert elicitation and Bayesian analysis of construction contract risks: an investigation. Construction Management and Economics, 24(01), 81-96.

Adedokun, O, Egbelakin, T and Omotayo, T (2024) Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(01), 66–74.

Aibinu, A A (2006) The relationship between distribution of control, fairness and potential for dispute in the claims handling process. Construction Management and Economics, 24(01), 45-54.

Alcaraz Carrillo de Albornoz, V, Ke, Y and Molina Millán, J (2024) Public-private partnerships: Pro-cyclical or counter-cyclical? An empirical study. International Journal of Construction Management, 24(01), 97–107.

Andi (2006) The importance and allocation of risks in Indonesian construction projects. Construction Management and Economics, 24(01), 69-80.

Arif, M, Al Zubi, M, Gupta, A D, Egbu, C, Walton, R O and Islam, R (2017) Knowledge sharing maturity model for Jordanian construction sector. Engineering, Construction and Architectural Management, 24(01), 170-88.

Asiedu, R O, Frempong, N K and Alfen, H W (2017) Predicting likelihood of cost overrun in educational projects. Engineering, Construction and Architectural Management, 24(01), 21-39.

Assaf, S A and Barhamain, S Y (1996) Factors affecting construction practices in Makkah Al-Mukkaramah, Saudi Arabia. Building Research & Information, 24(01), 27–30.

Assaf, S A, Al-Musallami, A I and Shash, A A (1996) Professional architectural/engineering consultancy practices in Saudi Arabia. Building Research & Information, 24(01), 59–62.

Bubshait, A A, Tahir, B M and Jannadi, M O (1996) Use of microsilica in concrete construction. Building Research & Information, 24(01), 41–9.

Chang-Richards, Y, Wilkinson, S, Seville, E and Brunsdon, D (2017) Effects of a major disaster on skills shortages in the construction industry: Lessons learned from New Zealand. Engineering, Construction and Architectural Management, 24(01), 2-20.

Dann, N, Hills, S and Worthing, D (2006) Assessing how organizations approach the maintenance management of listed buildings. Construction Management and Economics, 24(01), 97-104.

Davies, K, McMeel, D J and Wilkinson, S (2017) Making friends with Frankenstein: Hybrid practice in BIM. Engineering, Construction and Architectural Management, 24(01), 78-93.

Dawood, N and Sriprasert, E (2006) Construction scheduling using multi-constraint and genetic algorithms approach. Construction Management and Economics, 24(01), 19-30.

De Silva, G, Perera, B and Rodrigo, M (2019) Adaptive reuse of buildings: the case of Sri Lanka. Journal of Financial Management of Property and Construction, 24(01), 79–96.

Doukari, O, Kassem, M, Scoditti, E, Aguejdad, R and Greenwood, D (2024) A BIM based tool for evaluating building renovation strategies: the case of three demonstration sites in different European countries. Construction Innovation, 24(01), 365-83.

Enshassi, A (1996) Materials control and waste on building sites. Building Research & Information, 24(01), 31–4.

Faraji, A, Homayoon Arya, S, Ghasemi, E, Rashidi, M, Perera, S, Tam, V and Rahnamayiezekavat, P (2024) A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. Construction Innovation, 24(01), 384-406.

Friedman, A and Cammalleri, V (1996) The impact of R-2000 building technology on Canadian housing. Building Research & Information, 24(01), 5–13.

Garip, S B, Güzelci, O Z, Garip, E and Kocabay, S (2024) A genetic algorithm-based design model to provide reduced risk areas for housing interiors. Construction Innovation, 24(01), 49-66.

Gledson, B, Zulu, S L, Saad, A M and Ponton, H (2024) Digital leadership framework to support firm-level digital transformations for Construction 4.0. Construction Innovation, 24(01), 341-64.

Hao, Z, Wang, Y, Zhang, Y and Gong, E (2024) Evolutionary game analysis of stakeholders in villages-in-city reconstruction: Pazhou village as an example. International Journal of Construction Management, 24(01), 31–43.

Huang, Y C (2006) Graphical-based multistage scheduling method for RC buildings. Construction Management and Economics, 24(01), 5-18.

Jowett, B, Edwards, D J and Kassem, M (2024) Field BIM and mobile BIM technologies: a requirements taxonomy and its interactions with construction management functions. Construction Innovation, 24(01), 134-63.

K.V., P, V., V, R., V and Bhat, N (2019) Analysis of causes of delay in Indian construction projects and mitigation measures. Journal of Financial Management of Property and Construction, 24(01), 58–78.

Kärnä, S and Junnonen, J-M (2017) Designers’ performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(01), 154-69.

Kalutara, P, Zhang, G, Setunge, S and Wakefield, R (2017) Factors that influence Australian community buildings’ sustainable management. Engineering, Construction and Architectural Management, 24(01), 94-117.

Karunasena, G, Gajanayake, A, Wijeratne, W M P U, Milne, N, Udawatta, N, Perera, S, Crimston, A and Aliviano, P (2024) Liquid waste management in the construction sector: A systematic literature review. International Journal of Construction Management, 24(01), 86–96.

Leung, M-Y, Liu, A M M and Wong, M M-k (2006) Impact of stress-coping behaviour on estimation performance. Construction Management and Economics, 24(01), 55-67.

Likita, A J, Jelodar, M B, Vishnupriya, V and Rotimi, J O B (2024) Lean and BIM integration benefits construction management practices in New Zealand. Construction Innovation, 24(01), 106-33.

Lisco, M and Aulin, R (2024) Taxonomy supporting design strategies for reuse of building parts in timber-based construction. Construction Innovation, 24(01), 221-41.

Lu, W, Hua, Y and Zhang, S (2017) Logistic regression analysis for factors influencing cost performance of design-bid-build and design-build projects. Engineering, Construction and Architectural Management, 24(01), 118-32.

Lu, W, Li, Z and Wang, S (2017) The role of justice for cooperation and contract’s moderating effect in construction dispute negotiation. Engineering, Construction and Architectural Management, 24(01), 133-53.

Mahamedi, E, Wonders, M, Gerami Seresht, N, Woo, W L and Kassem, M (2024) A reinforcing transfer learning approach to predict buildings energy performance. Construction Innovation, 24(01), 242-55.

Mallawaarachchi, V T, Senanayake, S M A H, Disaratna, V and Perera, B A K S (2024) Application of subcontracting as a quality improvement tool for building constructions in Sri Lanka. International Journal of Construction Management, 24(01), 44–56.

Matoseiro Dinis, F, Rodrigues, R and Pedro da Silva Poças Martins, J (2024) Development and validation of natural user interfaces for semantic enrichment of BIM models using open formats. Construction Innovation, 24(01), 196-220.

Mbachu, J and Nkado, R (2006) Conceptual framework for assessment of client needs and satisfaction in the building development process. Construction Management and Economics, 24(01), 31-44.

Mohamed Abdelhaleem, H (2024) International green building systems and Egyptian green pyramid system: A comparative study. International Journal of Construction Management, 24(01), 57–65.

Osei-Kyei, R, Chan, A P, Yao, Y and Mazher, K M (2019) Conflict prevention measures for public–private partnerships in developing countries. Journal of Financial Management of Property and Construction, 24(01), 39–57.

Parisi, F, Sangiorgio, V, Parisi, N, Mangini, A M, Fanti, M P and Adam, J M (2024) A new concept for large additive manufacturing in construction: tower crane-based 3D printing controlled by deep reinforcement learning. Construction Innovation, 24(01), 8-32.

Philip, B and AlJassmi, H (2024) Time-series forecasting of road distress parameters using dynamic Bayesian belief networks. Construction Innovation, 24(01), 317-40.

Rampini, L and Re Cecconi, F (2024) Synthetic images generation for semantic understanding in facility management. Construction Innovation, 24(01), 33-48.

Rezaee Arjroody, A, Hosseini, S A, Akhbari, M, Safa, E and Asadpour, J (2024) Accurate estimation of cost and time utilizing risk analysis and simulation (case study: Road construction projects in Iran). International Journal of Construction Management, 24(01), 19–30.

Saif, W and Alshibani, A (2024) A close-range photogrammetric model for tracking and performance-based forecasting earthmoving operations. Construction Innovation, 24(01), 164-95.

Santoso, D S and Bourpanus, N (2019) Moving to e-bidding. Journal of Financial Management of Property and Construction, 24(01), 2–18.

Sarkar, A, Godbole, P N and Chakrabarti, S C (1996) Potential for expert systems in the assessment and repair of fire damaged buildings in India. Building Research & Information, 24(01), 51–8.

  • Type: Journal Article
  • Keywords: expert system; fire damage; India
  • ISBN/ISSN: 0961-3218
  • URL: https://doi.org/10.1080/09613219608727498
  • Abstract:
    Assessment of structural damage due to fire in buildings can be a complex process plagued by uncertainty. This complexity, argue the authors, arises from subjective opinion and imprecise numerical data. Expert system technology offers significant potential for a systematic assessment and repair of fire damaged buildings through the use of expert knowledge.

Sati, A and Al-Tabtabai, H (2024) A paradigm shift toward the application of blockchain in enhancing quality information management. Construction Innovation, 24(01), 407-24.

Semaan, N and Salem, M (2017) A deterministic contractor selection decision-support system for competitive bidding. Engineering, Construction and Architectural Management, 24(01), 61-77.

Shahtaheri, M, Haas, C T and Salimi, T (2017) A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects. Engineering, Construction and Architectural Management, 24(01), 40-60.

Singh, A, Kumar, V, Mittal, A and Verma, P (2024) Identifying critical challenges to lean construction adoption. Construction Innovation, 24(01), 67-105.

Singh, J and Anumba, C J (2024) Building commissioning process and documentation: A literature review and directions for future research. International Journal of Construction Management, 24(01), 75–85.

Singla, H K and Samanta, P K (2019) Determinants of dividend payout of construction companies: a panel data analysis. Journal of Financial Management of Property and Construction, 24(01), 19–38.

Tembo, C K, Muleya, F and Kanyemba, A (2024) An appraisal of cost management techniques used in the construction industry. International Journal of Construction Management, 24(01), 10–8.

Thomas, H R, Rees, S W and Lloyd, R M (1996) Measured heat losses through a real ground floor slab. Building Research & Information, 24(01), 15–26.

Velho Júnior, V E, Costa Melo, I, Alves Junior, P N and Rebelatto, D A d N (2019) Analysis of real estate management of lease service agreements by the public sector of a Latin American metropolis. Journal of Financial Management of Property and Construction , 24(01), 97–122.

Wild, S (1996) Observations on the use of ground waste clay brick as a cement replacement material. Building Research & Information, 24(01), 35–40.

Yin, Z, Caldas, C and de Oliveira, D (2024) Identification of business-project management processes that improve capital efficiency of downstream and chemical projects. International Journal of Construction Management, 24(01), 1–9.

Yu, J, Zhong, H and Bolpagni, M (2024) Integrating blockchain with building information modelling (BIM): a systematic review based on a sociotechnical system perspective. Construction Innovation, 24(01), 280-316.

Zani, A, Speroni, A, Mainini, A G, Zinzi, M, Caldas, L and Poli, T (2024) Customized shading solutions for complex building façades: the potential of an innovative cement-textile composite material through a performance-based generative design. Construction Innovation, 24(01), 256-79.