Abstracts – Search Results

Search or browse again, or refine search.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Raisbeck P (2013) Time keeps on slippin', slippin', slippin' into the future: BIM, imaging and time on construction sights. In: Smith, S D and Ahiaga-Dagbui, D D (Eds.), Proceedings 29th Annual ARCOM Conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, 1093–1102.

Raisbeck, P (2009) Considering design and ppp innovation: A review of design factors in PPP research. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 1, 239–47.

Raisbeck, P (2010) Investigating design as research: understanding R&D activities in Australian architectural practices. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 747–56.

Raisbeck, P (2019) Space Oddity: Spatial Design Strategies and Work Place Design . In: Gorse, C and Neilson, C J (Eds.), Proceedings 35th Annual ARCOM Conference, 2-4 September 2019, Leeds Beckett University, Leeds, UK Association of Researchers in Construction Management, 184- 193.

Raisbeck, P (2021) Taking the Pulse: Developing a Model of Resilience Capital for Architectural Firms. In: Scott, L and Neilson, C J (Eds.), Proceedings 37th Annual ARCOM Conference, 6-7 September 2021, UK, Association of Researchers in Construction Management, 96-105.

Raisbeck, P (2016) The Architect as Gleaner: Design Practice as Performance in the Architectural Office. In: Chan, P W and Neilson, C J (Eds.), Proceedings 32nd Annual ARCOM Conference, 5-7 September 2016, Manchester UK. Association of Researchers in Construction Management, 771–780.

Raisbeck, P (2017) Tribes, Warlords And Transformers: An Institutional Logics Model Of The Architectural Profession . In: Chan, P W and Neilson, C J (Eds.), Proceedings 33rd Annual ARCOM Conference, 4-6 September 2017, Fitzwilliam College, Cambridge, UK. Association of Researchers in Construction Management, 471–480.

Raisbeck, P and Aibinu, A A (2010) Early stage cost estimation and the relationship of architects to quantity surveyors. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 1, 53–61.

  • Type: Conference Proceedings
  • Keywords: architecture; communication; costs; design; estimating; quantity surveying
  • ISBN/ISSN: 978-0-9552390-4-5
  • URL: http://www.arcom.ac.uk/-docs/proceedings/ar2010-0053-0061_Raisbeck_and_Aibinu.pdf
  • Abstract:
    Understanding the dynamics between cost estimation and design in the project delivery process is essential if accuracy of early stage estimates must be improved. In Australia architects are the primary designers of buildings. Yet, in the Australian context very little work has examined how architects view cost estimation in order to understand cost dynamics. A first step in ascertaining the key issues in relation to cost estimation and design is when architects engage a Quantity Surveyor. The aim is to examine the costing of the conceptual design of projects rather than focusing on professional roles between architect and QS. The point at which a QS is appointed in the design process is identified. The types of issues that arise in relation to costing and design are recognized. To do this, 1132 architects were approached and 85 surveys were received. Each respondent was asked to answer questions related to the highest value project completed by their office. The types of design issues that were acknowledged were related to finishes, construction methods and materials. Of concern was the ability of the QS to cost accurately in situations that required expert knowledge related to a location or particular building type. The results are a first step in formulating further research investigating the ongoing cost messages and costing iterations that take place during the project delivery process. Understanding this dynamic in the first instance will aid research into value management, project benchmarking studies, bidding and tendering as well as stakeholder management studies.

Raisbeck, P and Tang, L C M (2009) Humanistic and scientific knowledge management: a comparison of design practice between architects and engineers. In: Dainty, A R J (Ed.), Proceedings 25th Annual ARCOM Conference, 7-9 September 2009, Nottingham, UK. Association of Researchers in Construction Management, Vol. 2, 729–38.

Raisbeck, P, Millie, R and Maher, A (2010) Assessing integrated project delivery: a comparative analysis of IPD and alliance contracting procurement routes. In: Egbu, C (Ed.), Proceedings 26th Annual ARCOM Conference, 6-8 September 2010, Leeds, UK. Association of Researchers in Construction Management, Vol. 2, 1019–28.