Amir, T (1986) Transient Response Analysis of a Dual Cycle System. Journal of Construction Engineering and Management, 112(03), 403–10.
- Type: Journal Article
- Keywords: Transient response; Productivity; Construction methods; Efficiency; Estimation;
- ISBN/ISSN: 0733-9364
- URL: https://doi.org/10.1061/(ASCE)0733-9364(1986)112:3(403)
- Abstract:
The increasing competition in the construction industry today not only calls for lower bid prices but for accurate estimates as well. Therefore, a contractor must continuousiy strive to improve his or her estimating techniques. A computer simulation which can be used to estimate the loss in efficiency that results when a dual cycle system is being started up each shift is presented. It does this by using the CYCLONE simulation model for several different simulated cases.