Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 1 results ...

Azman, M A, Hon, C K H, Skitmore, M, Lee, B L and Xia, B (2019) A Meta-frontier method of decomposing long-term construction productivity components and technological gaps at the firm level: evidence from Malaysia. Construction Management and Economics, 37(02), 72–88.

  • Type: Journal Article
  • Keywords: Malaysia; construction; firm; total factor productivity; Färe-Primont; meta-frontier;
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2018.1506139
  • Abstract:
    There is a need for a better approach to measure construction productivity rigorously, multilaterally, longitudinally and decomposed into its components. In response, this paper offers a robust approach to analysing construction productivity at the firm level that has been lacking in the industry to date, by measuring the Total Factor Productivity (TFP) of 37 public-listed Malaysian construction firms over 14 years (2003–2016), based on the Färe-Primont index. In comparing different groups of building, civil and specialist construction firms, this is the first application of a meta-frontier framework to capture the technological gaps involved. Based on the construction firms’ financial data, it is found that TFP improvement generally occurs due to Technical Efficiency (TE) and Scale-Mix Efficiency (SME) (largely scope economies), and significant technological gaps exist among different groups. Moreover, the industry suffered a decline in technologically related production environment over the period – prompting the conclusion that long-term policy engagement should focus on technological improvements. The paper provides a robust approach to analysing construction productivity at the firm level that also can be used for accessing productivity components and technological gaps in construction and other industries.