Abu El-Maaty, A E, El-Kholy, A M and Akal, A Y (2017) Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Engineering, Construction and Architectural Management, 24(05), 809-27.
- Type: Journal Article
- Keywords: regression analysis; mathematical modeling; schedule overrun; cost escalation and highway projects; statistical fuzzy model
- ISBN/ISSN:
- URL: https://doi.org/10.1108/ECAM-03-2016-0084
- Abstract:
This paper determines the causes of schedule overrun and cost escalation of highway projects showing that insufficient and ineligible technical staff is cause of schedule overrun; and inadequate project planning and execution is cause of cost escalation.